Loading...
Amberpoint BP-LR020301March 1,2002 ENGINEERING, INC. Transwestern Commercial Services 500, Spring Valley Road, Suite 600W ~/./~ Dallas, Texas 75244 Attn: Mr. Jim Ga.~n~r~ ~ ~ --.- Re:~valuationNo. 3 ~) ~~ ~' Z ~1~ -'~,~ ~' Amberpoint Building No. 1~ ~ Coppell, Texas ~ ~roject. N~29.0066 Gentlemen: HBC Engineering (HBC) has completed its third evaluation of moisture levels achieved by water pressure injection at the above referenced site. This evaluation was pedormed along the north portion and along the southwest portion of the Building No. 1 pad. The north portion of the pad was injected with seven passes with water and the southwest portion of the pad with four passes with water prior to this evaluation. A total of 22 borings were drilled at the site on February 22 and 23, 2002. Borings 1 through 16 are associated with the north portion of the pad and Borings 17 through 22 with the southwest portion. Each boring was continuously sampled to a depth of about 8 feet with steel tubes. The samples were extruded, logged, sealed and packaged at the site for transportation to the laboratory. In the laboratory, moisture content and hand penetrometer readings were determined on one foot intervals. Absorption swell tests and Atterberg Limits were also performed on selected samples to further evaluate the volume change potential of the injected clays. A diagram depicting the approximate boring locations is attached. Laboratory data is provided on the attached Summary of Laboratory Tests and Swell Tests Results. Review of moisture content determinations, hand penetrometer, and swell tests indicate that indicate that most of the moisture levels along the north portion are generally at or near desired levels. It is our opinion that additional injections along the north portion of the pad would be of little benefit. Therefore, HBC recommends that the select fill be installed along the north portion of the pad as soon as possible to maintain current moisture levels in the injected soils. Mr. Jim Gaspard Transwestern Commercial Services Mamh 1,2002 Page 2 At the southwest portion of the pad the majority of the samples obtained were below the desired moisture levels. HBC recommends that the southwest portion of the pad be injected by three additional injections using water and surfactant. The approximate area to be reinjected is shown on the attached Boring Location Diagram. Additional moisture evaluations will be required once the additional passes with water are completed. This information was conveyed to Hill and Wilkinson on February 27, 2002. Please contact us if there are any questions concerning the test results or recommendations. Sincerely, HBC ENGINEERING a d~~n ~owell, P.E Project Engineer CC: O'Brien & Associates / Richard Nordyke (1) TechniStructures, Inc./Keith Leslie (1) City of Coppell - Const. Insp. / Larry Davis (1) City of Coppell - Bldg. Insp. / Lee Stone (1) Hill & Wilkinson, Ltd. / Bryan Diagle/Kirk Woltman (1) Halff Associates / Jaime Beard/Travis Markham (1) N o LEGEND: AREA TO BE INJECTED WITH .5 ADDITIONAL PASSES SANDY LAKE ROAD NOTE: BORING LOCATIONS ARE APPROXIMATE 0 125 250 FEET APPROXIMATE SCALE BORING LOCATION DIAGRAM MOISTURE EVALUATION No. 3 AMBERPOINT BUILDING No. 1 COPPELL, TEXAS Project No., 94021029 Date, 02/27/02 MOISTURE EVALUATION NO. 3 SUMMARY OF LABORATORY TESTS PROJECT NAME: Amberpoint Building No. 1 Coppell, Texas PROJECT NO.: 94021029.0066 DATE: 02/27/02 Boring Depth Percent Hand Number (feet) Moisture Penetrometer 1 0-1 29 0.75 1-2 25 1.25 2~3 26 1.50 3-4 25 2.O0 4-5 26 2.00 5-6 26 2.25 6-7 26 2.75 7-8 25 2.25 2 0-1 25 1.00 1-2 24 200 2-3 21 2.50 3-4 20 4.5+ 4-5 19 4.5+ 5-6 20 4.5+ 6-7 16 4.5+ 7-8 18 4.5+ 3 0-1 25 3.25 1-2 17 45+ 2-3 16 4.5+ 3-4 15 4.5+ 4-5 24 3.0O 5-6 21 4.5+ 6-7 20 4.5+ 7-8 16 4.5+ 4 0-1 28 0.75 2-3 18 45+ 3-4 18 4.5+ 4-5 24 3.25 5-6 23 3.00 6~7 23 2.25 7-8 21 3.50 5 0-1 24 0.75 1-2 23 4.5+ 2-3 18 4.5+ 3-4 17 4.5+ 4-5 26 2.50 5-6 24 3.25 6-7 22 350 7-8 20 4.00 1-2 21 2.25 2-3 23 2.75 3-4 23 300 4-5 24 2.50 5-6 23 3.75 6-7 20 325 7-8 22 400 MOISTURE EVALUATION NO. 3 SUMMARY OF LABORATORY TESTS PROJECT NAME: Amberpoint Building No, 1 Coppell, Texas PROJECT NO.: 940210290066 DATE: 02/27/02 Boring Depth I Percent Hand Number (feett Moisture Penetrometer 7 0-1 26 1.25 1-2 22 1.75 2-3 16 2.25 3-4 26 3.25 4-5 22 3.25 5-6 21 4.25 6-7 16 4.5+ 7-8 18 3.25 8 0-1 22 1.25 1-2 23 2.00 2-3 17 4,5+ 3-4 17 4.5+ 4-5 19 3.00 5-6 17 4.5+ 6-7 17 4.5+ 7-8 18 4.5+ 9 0-1 19 2.00 1-2 15 4.5+ 2-3 14 4.5+ 3-4 21 2.25 4-5 19 2.50 5-6 17 4.00 6-7 17 4.00 7-8 19 3.50 10 0-1 17 2.00 1-2 20 2.25 2-3 17 3.25 3-4 18 4.5+ 4-5 18 4.5+ 5-6 16 3.50 6-7 17 3.50 7-8 17 3.50 11 0-1 25 1.50 1-2 25 1.25 2-3 22 1.50 3-4 20 275 4-5 18 3.50 5-6 18 4.00 6-7 17 3.00 7-8 15 4.OO 12 0-1 22 0.50 1-2 21 1.50 2-3 14 4,5+ 3-4 14 4.5+ 4-5 15 4.5+ 5-6 21 2.75 6-7 22 2.50 7-8 24 2.50 MOISTURE EVALUATION NO. 3 SUMMARY OF LABORATORY TESTS PROJECT NAME: Amberpoint Buitding No. 1 CoppelL Texas PROJECT NO.: 94021029.0066 DATE: 02/27102 Bodng Depth Percent Hand i Number (feet) ; Moisture Penetrometer 1-2 24 1.00 2-3 22 1 75 4-5 22 4 O0 5-6 18 4.00 6-7 18 4 5+ 7-6 15 45+ 14 0-1 22 1 50 1-2 18 45+ 2-3 18 4 5+ 3 4 22 45+ 4-5 19 45+ 5-6 22 2.75 6-7 20 225 7-8 18 250 15 0-1 25 2 O0 1-2 23 1 25 2-3 20 2.75 3-4 18 45+ 4-5 21 350 5-6 17 45+ 6-7 17 45+ 7-8 17 4.5+ 16 0-1 22 075 2-3 20 2 O0 3-4 17 45+ 4-5 21 2 75 5-6 18 4.5+ 6-7 19 4 5+ 7-8 20 4.5+ 17 0-1 20 4.5+ 1-2 22 3 50 2-3 26 325 3-4 25 4 25 4-5 27 225 5-6 21 3 O0 6-7 20 350 7-8 18 4.00 18 0-1 26 150 1-2 22 275 2-3 19 45+ 3-4 20 4 5+ 4-5 24 4 5+ 5-6 17 45+ 6-7 16 45+ 7-8 14 45+ MOISTURE EVALUATION NO. 3 SUMMARY OF LABORATORY TESTS PROJECT NAME: Amberpoint Building No. 1 Coppell, Texas PROJECT NO,: 94021029.0066 DATE: 02/27/02 Bodng Depth Percent Hand Number (feet) Moisture Penetrometer 19 0-1 21 4.25 1-2 16 4.5+ 2-3 16 4,5+ 3-4 23 4.5+ 4-5 21 4.5+ 5-6 20 4.5+ 6-7 15 4.5+ 7-8 12 4.5+ 20 0-1 28 1,25 1-2 27 2.25 2-3 24 4.00 3-4 21 4,5+ 4-5 30 2.25 5-6 24 4,5+ 6-7 22 4.5+ 7-8 23 4.5+ 21 0-1 19 3.75 1-2 22 4.5+ 2-3 24 4.5+ 3-4 28 2.50 4-5 23 3.25 5-6 22 4,25 6-7 20 4.5+ 7-8 17 4.5+ 22 0-1 27 0.75 1-2 17 4.5+ 2-3 18 4.5+ 3-4 20 4.5+ 4-5 27 2.50 5-6 22 4.25 6-7 20 4.00 7-8 17 4.5+ O~ 0 '1-