Loading...
Northpoint Dr-CS020226 (3)· ,, Halff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS · SURVEYORS 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214) 346-6200 FAX (214) 739-0095 February26,2002 Gary Johnson, P.E. Assistant City Engineer 255 Parkway Coppell TX, 75019 RE: Amberpoint Business Park At Coppell, Northpoint Drive extension Dear Mr. Johnson We have reviewed the comments dated Doeember 26, 2002 regarding the above stated plans. We have addressed the comments as follows General Comments 1. The plans are sealed. 2. The previous letter from our office dated February 25,2002 has been signed by a professional engineer. A copy is enclosed for your records. 3. The plat is included with these plans. Sheet CPPO1 1. We have corrected the typing and drafting errors on this sheet. Sheet CPP03 1. We have removed the stray object in the profile at STA 28+80. Sheet CGP02 1. We have added compaction requirements for the embankment to general note #6. As discussed, HBC has collected P.I. data from the embankment that has been constructed. They are currently analyzing the data from their borings and will make appropriate recommendation if the material does not meet their standards for detention facilities. Sheet CDA03 1. We have added additional data to the stage / storage ! discharge table. The Detention storage requirements were calculated using the modified rational method. As discussed, routing was not utilized to calculate the required storage volume. Sheet CSDO1 We have removed the waterline from the profile per changes in the plan view. DALLAS · FORTWORTH · HOUSTON · McALLEN TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL · ENVIRONMENTAL · STRUCTURAL MECHANICAL · ELECTRICAL · SURVEYING · GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING · .. Halff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS · SURVEYORS Sheet CSD03 1. We have removed the "end and plug" note form line A-lB. Sheet CSD05 1. We have added the contour information around the outlet of Line B as requested. 2. We have revised the HGL of line B-lB and B-lC per the changes to line B-I. Sheet CSD06 1. We have revised the anti-seep collar to provide adequate protection. 2. We have added the flow line of the 54" RCP as requested. 2. We have corrected labeling at STA 1+47 for the 30" RCP. Sheet CWW02 1. We have encased the water line where it crosses under the 18" RCP as requested. Sheet CWW03 1. We have corrected the note referencing the verification of the existing W.L. Sheet CWW05 1. We have added a 5' diameter MH to STA 12+51. 2. We have added top of rim elevations to all manholes. Sheet CPMO1 1. We have corrected the drafting error If you have any questions please do not hesitate to call me at (214) 346-6324. Sincerely, Halff Associates, Inc. ~rd, E.I.T. Cc: Jim Gaspard, Transwestem Commemial Services