Loading...
Amberpoint BP-LR020220WATER INJECTION OBSERVATION Date of Service: Client No.: Client: O2/2O/O2 3181 Transwestern Commercial Services 5001 Spring Valley Rd. Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0065 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppel! Coppell, Texas Location: Procedure: Building Pad, lines C to F and I to 5.8 General Contractor: injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 SPECIFICATION ~ Surfactant added to each load. ~ressure 50 to 200__p..~at manifold. I~ction downward in 18 inch intervals. Total de~ection was 10 feet. ~ection was 5 feet maximum. Probe Length: 10 feet OBSERVATION Yes X X X X X X Comments: Technician: S. Long Report Distribution: ( 1 )Transwestem Conunercial Services (1) O'Brien & Associates, Inc. (I) TechniStructures, Inc. (I) City of Coppell - Constr. lnsp (I) City of Coppell Bldg. lnsp. (I) Hill & Wilkinson, Ltd. (I) Halff Associates (I) State Farm Insurance [-L~C Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer [- -] I I -I ®