Amberpoint BP-LR020220WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
O2/2O/O2
3181
Transwestern Commercial Services
5001 Spring Valley Rd. Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0065
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. @ Coppel!
Coppell, Texas
Location:
Procedure:
Building Pad, lines C to F and
I to 5.8
General Contractor:
injector: Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 4th No. of Probes: 4
SPECIFICATION ~
Surfactant added to each load.
~ressure 50 to 200__p..~at manifold.
I~ction downward in 18 inch intervals.
Total de~ection was 10 feet.
~ection was 5 feet maximum.
Probe Length: 10 feet
OBSERVATION
Yes
X
X
X
X
X
X
Comments:
Technician: S. Long
Report Distribution:
( 1 )Transwestem Conunercial Services
(1) O'Brien & Associates, Inc.
(I) TechniStructures, Inc.
(I) City of Coppell - Constr. lnsp
(I) City of Coppell Bldg. lnsp.
(I) Hill & Wilkinson, Ltd.
(I) Halff Associates
(I) State Farm Insurance
[-L~C Engineering, Inc.
Eugene Harbour
Principal
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
[- -]
I I
-I
®