Loading...
Amberpoint BP-LR020219 (2)WATER INJECTION OBSERVATION Date of Service: 02/19/02 Report No.: Client No.: 3181 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 94021029.0063 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Location: Building Pad, lines G to Q, 7 to 5.8 General Contractor: and lines A to C, 5.8 to 1 Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 5th & 4th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10+C47 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: S. Long Report Distribution: ( 1 ) Transwcstem Commercial Services (I) O'Brien & Associates, Inc. (I) TechniStructures, Inc. (1) City of Coppel - Constr Insp. (1) City of Coppell - Bldg Insp. (I) Hill & Wilkinson, Ltd ( I ) Halff Associates (1) State Farm Insurance m~ Engineering, Inc. '~?bour Eugene Har Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer