Amberpoint BP-LR020219 (2)WATER INJECTION OBSERVATION
Date of Service: 02/19/02 Report No.:
Client No.: 3181 Project No.:
Client: Transwestem Commercial Services Project:
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
94021029.0063
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad, lines G to Q, 7 to 5.8 General Contractor:
and lines A to C, 5.8 to 1 Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 5th & 4th No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10+C47 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
( 1 ) Transwcstem Commercial Services
(I) O'Brien & Associates, Inc.
(I) TechniStructures, Inc.
(1) City of Coppel - Constr Insp.
(1) City of Coppell - Bldg Insp.
(I) Hill & Wilkinson, Ltd
( I ) Halff Associates
(1) State Farm Insurance
m~ Engineering, Inc.
'~?bour
Eugene Har
Principal
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer