Loading...
Amberpoint BP-LR020218WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 02/18/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0061 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Location: Building Pad, lines G to Q, 7 to 11 General Contractor: Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 5th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing3 of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: S. Long Report Distribution: (I) Transwestern Commercial Services (1) O'grien & Associates, Inc ( 1 ) TechniStrucmres, Inc ( I ) City of Coppell - Constr. Insp 99ss ( I ) City of Coppcll - Bldg Insp (I) Hill & Wilkinson, Ltd ( 1 ) Halff Associates ( 1 ) State Farm Insurance Engineering, Inc. Eugene Harbour Principal This repeal is exclusively tot the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer ~ ® ??