Amberpoint BP-LR020218WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
02/18/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0061
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Location:
Building Pad, lines G to Q, 7 to 11
General Contractor:
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 5th No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing3 of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: S. Long
Report Distribution:
(I) Transwestern Commercial Services
(1) O'grien & Associates, Inc
( 1 ) TechniStrucmres, Inc
( I ) City of Coppell - Constr. Insp
99ss
( I ) City of Coppcll - Bldg Insp
(I) Hill & Wilkinson, Ltd
( 1 ) Halff Associates
( 1 ) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
This repeal is exclusively tot the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
~ ®
??