Loading...
Amberpoint BP-LR020215WATER INJECTION OBSERVATION ENGINEERING, INC. Date of Service: Client No,: Client: Location: Procedure: 02/15/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021029.0057 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Building Pad, lines 1 to 5.8, M to N General Contractor: Hill & Wilkinson and 4 to 5.8, N to P Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X In, iection to refusal at each location. X Comments: Injection was downward in 12 inch intervals with minimum of one refusal. Technician: S. Long Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates, lac. ( 1 ) TechniStructures, Inc. (1) City of Coppell - ConstL lasp. ( 1 ) City of Coppetl - Bldg. Insp. (1) Hill & Wilkinson, lad. ( 1 ) Halff Associates (I) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 99sks This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer ?? ???® WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 02/15/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021029.0056 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (I) Transwestem Commercial Services (I) O'Brien & Associates, Mc. (1) TechniStructures, Inc. (1) City of Coppell - Const~. lnsp. ( 1 ) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd (I) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 99sks This repor~ is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer ,l°