Amberpoint BP-LR020214WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 02/14/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0055 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Building Pad, see attached sketch General Contractor: Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st & 2nd No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: On this date, HBC's technician attened a meeting with Hill & Wilkinson and Jowell. The outcome of this meeting was to change the injection process to a 12 inch drop and a minium of one refusal at each drop. Technician: S. Long Report Distribution: ( 1 ) mranswestern Commcrcial Services (1) O'Brien & Associates, Inc. ( I ) TechniStructures, lnc (1) City of Coppell - Conslr lnsp. ( l ) City of Coppell - BIdg. Ins p (1) Hill & Wilkinson, Ltd (1) Halff Associates (1) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wriilen approval of HBC Engineering, Inc. WATER INJECTION OBSERVATION ENGINEERING, INC. Date of Service: Client No.: Client: Location: Procedure: 02/14/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: Building Pad General Contractor: Injector: 94021029.0054 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Hill & Wilkinson Jowel On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd & 3rd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of iniection was 10 feet. X Spacing of injection was 5 feet maximum. X ,,,. X Iniection to refusal at each location. . ~ Comments: Technician: S. Campbell Report Distribution: (I) Transwestera Commercial Services (1) O'Brien & Associates, Inc. (I) TechniStmctures, Inc (1) City of Coppell - Constr. Insp (1) City of Coppell Bldg. Insp (I) Hill & Wilkinson Ltd. ( I ) Halff Associates ( I ) State Farm Insurance 99ss This repod is exclusively for the use of the client indicated above and shall not be reproduc( Engineering, Inc. Eugene Harbour Principal in full witl~out written approval of HOC Engineering, Inc