Amberpoint BP-LR020213WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 02/13/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021029.0052 94021029 Amberpoint Building No. 1 Ambeq~oint Bus. Pk @ Coppell Coppell, Texas Building Pad, lines G to E.8 and 5.8 to I General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: ~. Long Report Distribution: ( I ) Transwestern Commercial Services (I) O'Brien & Associates, inc. (I) TechniStructures, [nc. (1) City of Coppell - Constr. [nsp. (I) City of Coppell - Bldg. lnsp (1) Hill & Wilkinson, Ltd. (I) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 99sks This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer WATER INJECTION OBSERVATION Date of Service: 02/13/02 Report No.: Client No.: 3181 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Location: Building Pad General Contractor: Injector: 94021029.0051 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Hill & Wilkinson Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant ~dded to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X In,jection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Transwcstem Commercial Services (1) O'Brien & Associates, Inc. (1) TechniStmctures, lac. (1) City of Co@pell - Coastr. lnsp. (I) City of Coppell Bldg. Insp. (1) Hill & Wilkinson, Ltd. (I) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 99sks This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer