Loading...
Amberpoint BP-LR020212 (2)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 02/12/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600W Dallas, Texas 75244 Building Pad, lines D to G and 2 to 5.8 Report No.: Project No.: Project: General Contractor: Injector: 94021029.0050 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Hill & Wilkinson Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Jowell was notified that the surfactant level in the tank was not changing. Jowel insisted the surfactant was going in. Later in the day, approximately 3:00 p.m., Jowell discovered that the tank lines were clogged not allowing the surfactant to flow. Technician: S. Long Report Distribution: (I) Transwestem Conunercial Services (1) O'Brien & Associates, Inc. (I) TechniStructurcs, Inc. (1) City of Coppell Constr. Insp. (I) City of Coppell - Bldg. h[sp. (1) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 99sks This report is exclusively for the use of the client indicated above and shall not be reproduced in tull without written approval of HBC Engineer