Loading...
CF-Coppell Rd SC-LR020311Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF SOIL GRADATIONS CLIENT: Texas Unified Constructors, Inc. DATE: PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: Coppell, TX SAMPLES: Taken by representative of Hooper Engineering Laboratories, Inc, on 3/11/02. 11 March 2002 01.1054 LOCATION PERCENT PASSING NO, 4 SIEVE % Northwest Parking Area 11) approx. 30' south of north curbline 64.3 approx. 10' east of west curbline 12) approx. 30' south of north curbline 60.5 approx. 25' west of east curbline 13) approx. 40' north of south curbline 63.0 approx. 45' west of east curbline Southwest Parking Area 14) approx. 20' south of north curbline 65.4 approx. 30' west of east curbline 15) approx. 50' north of south curbline 71.2 approx. 50' east of west curbline 16) approx. 30' north of south curbline 65.3 approx. 10' east of west curbline Entrance Drive/Fire Lane 17) approx. 250' east of Coppell Road 60.7 18) approx. 50' east of Coppell Road 62.5 NOTE: 100% of all tested material passed the 1-3/4" sieve. TECHNICIAN: CDJ DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. SPECIFICATION REQUIREMENTS % 60+ 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS 115) 116) 117) 118) 119) 120) CLIENT: Texas Unified Constructors, lnc. DATE: 11 March 2002 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Grey Silty Clay with Lime 2) Lime Stabilized Subgrade * Dark Brown Clay with Lime ASTM D 698 STANDARD PROCTOR: 1) 96.0 pcf ~ 23.0% Moisture 2) 84.0 pcf @ 30.5% Moisture LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Head-In Parking South of Service Center approx. 15' south of south bldg. line 1 approx. 40' west of east bldg. line Fin. Sub. 23.7 93.0 96.9 Fire Lane South of Service Center approx. 50' south of south bldg. line 2 approx. 10' west of east bldg. line Fin. Sub. 30.0 85.7 102.0 approx. 30' south of south bldg. line approx. 25' east of west bldg. line 1 Fin. Sub. 26.0 91.2 95.0 Southwest Parking Area approx. 25' north of south curbline approx. 40' east of west curbline 2 Fin Sub, 31.6 84.5 100.6 approx. 100' north of south curbline approx. 20' west of east curbline 1 Fin. Sub. 25.6 92.5 96.3 approx. 25' south of north curbline 2 approx. 20' east of west curbline Fin. Sub. 30.0 86.3 102.7 95+ -1% to +3% Of Optimum TECHNICIAN: DISTRIBUTION: CDJ (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148