Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Riverside Church-LR020305
83/18/2882 16:34 9728780802 TRINITY ENGR-DALLA$ PAGE 03/04 ATRINITY ENGINEERING TESTING CORPORATION Construction Observation Report Reviewed by -- Date Reviewed DFR No,~O~'~' -- Time Arrived _._"~t~ /Z3~, Time Departed --~ Travel Time ~ ~sonry ~ Batch plant ,? Foundations [~ Concrete ,¢ We.,¢_ WeJding "'" Reinforcement Steel !~ ¢ireproeftng '~ Soil lng L~ Pre-Post Tensioned Tendon ~J Metal Becking _r~ Other 83/18./2882 16:3~ 9728788882 T~INIT¥ ENGR-D~LLA$ P~GE 84,/0~ ATRINITY ENGINEERING TESTING CORPORATION Construction Observation Report Client ~.~_- Project Project Location Reviewed Oy __ Bldg. Permit NO. --- Dale Reviewed Time Arrived Time Departed Travel Time 'P~ge of Observations '-- Masonry F~ Batch plant ~ Foundations Z Concrete ~'eiding [] Reinforcement Steel IZ Fireprooflrg ,~ So~1 _ -m Other I~ Bolting ~_. Pre-Post Tensioned Tendon Metal Decking Documents Referenced -- Page __~-of _~--.~'-- Rep~ Name F-t