Loading...
PA9702-LR 991001 (2)GROUT COMPRESSIC STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Tens 75247 Date of Service: 09/15/1999 Report No.: 9925022 Report Date 10/01/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co ell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~eid 300BlockofParkwayBlvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Sample grout from delivery vehicle, cast 3" x 3" x 6" prisms in accordance with the recommendations of ASTM C 1019. PROJECT DATA CONTRACTOR: Hisaw & Assoc. GROUT CLASS: N/A GROUT SUPPLIER: On-Site pLACEMENT DATE: 09/15/1999 BATCH TIME: 8:50am PLANT: On-Site TIME SAMPLED: 9:00am BY: Del Ratlift SPECIFICATION REQUIREMENTS WEATHER CONnrrIOSS: Warm, clear, calm STRmqGTm 2500 psi @ 28 Days TEMPs~RATURE ~ - AIR 73 F GROUT: 75 TRUCK NO: N/A TICKET NO: N/A TEST METHOD: ASTMC1019 PLACEMENTLOCATION: Gynmasium east wall SAMPLE LOCATION: See below SAMPLE SIZE: 3" X 3" X 6" REPORT OF TESTS PRISM MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (Ibs. force) (psi) 1 1 6.00 09/22/1999 7 32580 3150 1 2 6.00 10/13/1999 28 I 3 6.00 10/13/1999 28 Sample location: 10' S northeast building corner, 5 course from top Technician Time: See Report #9925023 Technician: DoI Ratlift Started: Finished: ~ Engineer Report Distribution: (1) Ci',y of Coppell (1) City ofCoppell - Engineerlag (1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. lnsp. Eug Vice Pres' nt (l) Turner Engineers (1) City of Coppell - Leisure Serv Dept lde (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 09LLW Page 1 of I