Loading...
Amberpoint BP-LR020220 (2)WATER INJECTION OBSERVATION Report No.: 94021029.0064 Project No.: 940~107q Proj .~rpoint Building N9 ~_ Ambemoint Bus. Pk.,~Coppell -- C,,vv,.ll, Date of Service: 02/20/02 Client No.: 3181~,~....~ Client.~,,~;~;~a~o~n ~ommercla[ berv~cc~ f~'~ 5001 Spring Valley Rd., Suite 60?q,~ {~ Dallas, TX 7524~,~,, Location: Building Pad - see attached sketch General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 6th & 7th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Transwestem Commercial Services (1) O'Brien & Associates, Inc. (1) TechniStmctures, Inc. (I) Ciiy of Coppell - Constr. Insp. . 00 (1) City of Coppell - Bldg. lnspl. (1) Hill & Wilkinson, Ltd. (I) Halff Associates (1) State Farm Insurance IBC Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wdtten approval of HBC Engineer J~F_?OfkT NO, '~ ctqOaIO,..9,°l.