Loading...
Amberpoint BP-LR020221 (3)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 02/2 l/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0067 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk ~ Coppell Coppell, Texas Building Pad - see attached sketch General Contractor: Injector: Hill & Wilkinson Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 7th & 2nd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (1) Transwcstcm Commercial Services (1) O'Bricn & Associates, Inc. (1) TcchniStructures, Inc. (I) City of Coppell - Consb-. [nsp. (1) City ofCoppell - Bldg. lnsp, (1) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance I-Be Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer I