Loading...
Amberpoint BP-LR020219 (3)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 02/19/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd. Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: Building Pad - see attached sketch General Contractor: Injector: 94021029.0062 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Hill & Wilkinson Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 7th & 6th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Ipiection to refusal at each location. X Commen~: Technician: S. Campbell Report Distribution: (I) Transwcstem Commercial Services (I) O'Bricn & Associates, Inc. (1) T¢chniStmcturcs, Inc. (1) City of Coppell - Constr. lnsp. 99ss (1) City of CoppelI - Bldg. lnsp. (I) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance H~ Engineering, Inc. Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not bo reproduced in full without wriffen approval of HBC Engineer