Amberpoint BP-LR020218 (2)WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
02/18/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd., Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0060
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Location:
Building Pad - see attached sketch General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 7th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
In, iection to refusal at each location. X
Comments:
Technician: S. Campbell
Report Distribution:
(1) Transwcstcm Commercial Services
(1) O' Brien & Associates, Inc.
(I) TcchniStructurcs, Inc.
(1) City ofCoppcll - Constr. lnsp.
99ss
(1) City of Coppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Insurance
m~ Engineering, Inc.
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wutten approval of H BC Engineer
~- I~-d gL.
o06o
I I I I I