Loading...
Amberpoint BP-LR020223WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 02/23/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0071 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Location: Building Pad - see attached sketch General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of in, jection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: (I) Transwestem Commercial Services (1) O' Brien & Associates, Inc. (1) TechniStructures, Inc. (1) City ofCoppell - Constr. lnsp. 99ss (I) City ofCoppell - Bldg. lnsp. (I) Hill & Wilkinson, Ltd. (I) HalffAssociates (1) State Farm Insurance I-I]C Engineering, Inc. Eugene Harbour Principal This re~ort is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer :l°