Loading...
CF-Coppell Rd SC-CS020305TEXAS UNIFIED CONSTRUCTORS, INC. 803 E. MAIN STREET SUIT B. ALLEN, TEXAS 75002-3100 CC (972) 359-6660 FAX (972) 359-6661 TUCI Mark Murphy 972.359.6661 Copped Brad Reid 972.304.3547 Vidaud Cliff Macon 972.458.2323 COPPELL SERVICE CENTER JOBSITE MEETING REVIEW I)~te: Typ~: Tue 3/05/2002 Semi-monthly Nmber: Job no. 8ubJe~: 18 0107 General 1. Rain Days 53(In dispute) 2. Submittals (good shape) 3. Job progress A. Concrete: All slabs poured except for slab on form TUCI has gone ahead with the plumbing revisions and is preparing to pour main slab on Thursday TUCI has received Dave Adams comments on low air content in building slabs TUCI has referred this to Lattimore materials Quality control department and they have corrected the problem and the ak content has increased. Lattimore wondered why that the Eng. was requesting such high air content. Dave Adams stated that because of many and more rapid temperature changes such as Texas has that the concrete with lower air content tended to break down sooner. B. Excavation: they are now mixing lime now and are about halfway done. C. Plumbing: have passed all underground plumbing inspections and have rearranged ADA plumbing. Gas main is complete and inspected D. Electrical: all underground work including change order is complete E. Structural: is sending the rest oftbe embeds for panels F. Masonry: Has started and cannot proceed above 4' until fire lane is installed RFI~s #28 A. TUCI still would like to have some pier information for the building sign. C. TUCI would still like more information to pour this beam support for the gate. It seems to relate back to the manufactures recommendations. When they are supplied it can be reviewed again. #32 A. Proper column size was answered by Vidand and should be 2'7 %" #33 A. Expansiun joint in east block wall of utility Bid can go behind the downspout where it will not be seen. B. To be reviewed by Vidaud #34 A. Plat information has been referred to Doyle Eng B. Overflow alarm for reclaimed water tank referred to Schmitt and Stacy C. Pump info referred to Vidaud #35 A. Panel column dowel connection Dave Adams sent TUCI a drawing with dowels bent in to panel to solve this problem. B. Dim of panel reveals Vidaud said to make the lower reveal 2" and the upper reveal 1 ½" to match 45 degree cant at block columns C. ADA toilet stall Dim. confirmed D. Dim of standard toilet stall will be 36" E. Delete rear outlet toilet confirmed Were reviewed and are noted in the RFI log It was decided that a fur down is not needed for the AC in the utility Bid. 4. RFP Status 5. ASI Status 6. Change Order (Change order has been put together) Next Biweekly Meeting Tue March 19th 2002