DR0002-CS020307March 7, 2002
Mark and Maureen Smith
134 Meadowcreek Road
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. and Mrs. Smith:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
Suzan~aylor
C.I.P.~Co~ordinator
T H E - C: I T Y 0 F
COiSiSELL
March 7, 2002
Charles and Cynthia Shirm
134 Maywood Circle
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. and Mrs. Shinn:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
aylor
rdinator
March 7, 2002
Randolph and Lynn Brown
149 Meadowcreek Road
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. and Mrs. Brown:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
Suza~LqkTaylor
C.I.p.h~_.~}rdinator
T H E · C i T Y · 0 F
COP?ELL
March 7, 2002
Dean and Michele Preston
157 Meadowcreek Road
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. and Mrs. Preston:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
Suzanl3x Taylor
C.I.P. ~o~rdinator
T H E C I T Y 0 F
March 7, 2002
George and Dawn Dixon
153 Meadowcreek Road
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. And Mrs. Dixon:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
Suzar~ C'k Taylor
C.I.P.'C:,obrdinator
coPPEE
March 7, 2002
James F. Mayo
150 Maywood Circle
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. Mayo:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
Suzari C~, Taylor
C.I.p.~C~rdinator
T H E · C I T Y 0 F
COPPELI
March 7, 2002
David E. Wortman
152 Meadowcreek Road
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. Wortman:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
oTrad~ln~tor
T H £ · C I T Y * 0 F
COP?ELL
March 7, 2002
Thomas and Evelyn Elwood
156 Meadowcreek Rd
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. And Mrs. Elwood:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet ora 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
Suza~ ~. Taylor
C.I.P.'~'oordinator
T H E C I T Y 0 F
COP?ELL
March 7, 2002
Vincent and Cathryn O'Toole
145 Meadowcreek Road
Coppell, TX 75019
Meadowcreek Drainage Project
DR 00-02
Notice of Proposed Construction
Dear Mr. and Mrs. O'Toole:
This letter is to notify you of the proposed construction of the Meadowcreek Drainage
Project, by the City of Coppell. The project is in the general vicinity of your home and
property located on Meadowcreek Road. This project consists of the extension of an
existing 54" diameter pipe culvert with 175 linear feet of a 6'x5' box culvert between the
houses located at 153 and 149 Meadowcreek Road, and drainage improvements
necessary to provide for the local runoff. The construction of this project is anticipated
to begin on or around March 18, with an estimated construction time of 60 days.
Residents should expect construction noise and traffic during this time.
Should you have any questions or need any additional information, please contact me at
972-304-7019 or the inspector for the Project, Garreth Campbell, at 972-304-3685.
Sincerely,
aylor
rdinator