ST9905-CS020308LETTER OF TRANSMITTAL
3010 LBJ Freeway, Suite 990 (972) 280-9300 * Fax (972) 280-9715
· TO:
FROM:
Mr. Charles Martinez 972-907-2964
Brower Design Services
1208 West Executive Drive
Richardson, TX 75081
Craig Bond
DATE: March 8, 2002 NO. 20000890
RE: Bethel Road Project
Utility Relocation
WE ARE SENDING YOU VIA: [] Mail [] Delivery,/HE FOLLOWING ITEMS:
COPIES I DESCRIPTION
I Electronic Copy of 60%Set of Plans
THESE ARE TRANSMI~rED AS CHECKED BELOW:
[] For Your Use
X As Requested
[] For Reviewand Comment []
[] For Approval []
Approved as Submitted
Returned for Corrections
See Remarks
[] Approved as Noted
[] Rejected
-REMARKS:
Enclosed you will find a 60% set of electronic plans to aid you in your utility relocation design for MSN,
AT&T and SW Bell. This is a follow-up to the preliminary set of plans sent out on November 19, 2001. The
enclosed set of 60% plans includes the following sheets:
· Cover Sheet, Project Layout, Pdght-Of-Way Acquisition Plan, Plan & Profile Sheets, Proposed Roadway
Sections, Water & Sewer Adjustments, Drainage Area Map, Storm Drain Plan & Profile
The current construction let date is planned for October 1,2002. Please coordinate any utility relocations
accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the
City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-
304-3679. Thank-you.
COPY TO: SIGNED:
GA200\00890-Coppell\adm~Faxes and Transmittals\T-BrowerDesign,doc
March 7, 2002
C 0 N 8 U L T A N T 8
Mr. Mark Wilson
TXU Communications Telecom Services Company
115 W. 7th Street, Suite 308
Fort Worth, Texas 76102
Re:
Utility Relocations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Parkway, Coppell, Texas
Dear Mr. Wilson:
This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a
4-lane road with a 16' median.
Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is
a folloxv-up to the preliminary set of plans sent to you on November 19, 2001. The
enclosed set of 60% plans includes the follo~ving sheets:
,, Cover Sheet
· Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Roadway Sections
· Water & Sewer Adjustments
· Drainage Area Map
· Storm Drain Plan & Profile
The current construction let date is planned for October 1, 2002. Please coordinate any
utility relocations accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincerely,
TranSystems Corporation Consultants
Craig Bond, P.E.
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell
500 W. 7th Street, Suite 600, Postal Unit #20 o Fort Worth, TX 76102-4773 * Tel: (817) 339-8950 · Fax: (817) 336-2247
March 7, 2002
C 0 N S U L T A N T S
Mr. Reeves Partain
TXU Electric & Gas
301 S. Harwood, 6 South
Dallas, Texas 75201
Re:
Utility Relocations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Parkway, Coppell, Texas
Dear Mr. Partain:
This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a
4-lane road with a 16' median.
Enclosed you ~vill find a 60% set of plans to aid you in any utility relocation design. This is
a follo~v-up to the preliminary set of plans sent to you on November 19, 200 I. The
enclosed set of 60% plans includes the following sheets:
· Cover Sheet
· Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Road~vay Sections
· Water & Sewer Adjustments
· Drainage Area Map
· Storm Drain Plan & Profile
The current construction let date is planned for October 1, 2002. Please coordinate any
utility relocations accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincerely,
TranSystems Corporation Consultants
Craig Bond, P.E.
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell
500 W. 7th Street, Suite 600, Postal Unit #20 · Fort Worth, TX 76102-4773 · Tel: (817) 339 8950 · Fax: (817) 336-2247
March 7, 2002
C 0 N S U L T A N T S
Mr. Bob Holland
Verizon
540 W. Elm
Lewisville, Texas 75067
Re:
Utility Locations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Park~vay, Coppell, Texas
Dear Mr. Holland:
This letter is in reference to the proposed xvidening of Bethel Road from a 2~lane road to a
4-lane road with a 16' median.
Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is
a follow-up to the preliminary set of plans sent to you on November 19, 2001. The
enclosed set of 60% plans includes the following sheets:
· Cover Sheet
,, Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Roadway Sections
· Water & Sewer Adjustments
· Drainage Area Map
· Storm Drain Plan & Profile
The current construction let date is planned for October 1, 2002. Please coordinate any
utility relocations accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincemly,
TranSystems Corporation Consultants
Craig Bond, P.E.
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell.
500 W. 7th Street, Suite 600, Postal Unit #20 · Fort Worth, TX 76102-4773 * Tel: (817) 339-8950 o Fax: (817) 336-2247
March 6, 2002
C 0 N S U L T A N T 8
Ms. Glenda Fisher
Touch America
cio Po~ver Engineers, Inc.
3900 S. Wadsworth Blvd. Suite 700
Lakewood, Colorado 80235
Re:
Utility Locations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Parkway, Coppell, Texas
Dear Ms. Fisher:
This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a
4-lane road with a 16' median.
Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is
a follow-up to the preliminary set of plans sent to you on November 19, 2001. The
enclosed set of 60% plans includes the following sheets:
· Cover Sheet
· Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Roadway Sections
· Water & Server Adjustments
· Drainage Area Map
· Storm Drain Plan & Profile
The current construction let date is planned for October l, 2002. Please coordinate any
utility relocations accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincerely,
TranSystems Corporation Consultants
Craig Bond, P.E:
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell
500 W. 7th Street, Suite 600, Postal Unit #20 · Fort Worth, TX 76102-4773 o Tel: (817) 339-8950 · Fax: (817) 336-2247
March 7, 2002
TION /t,~
CONSULTANTS
Touch America
c/o Mr. T.C. Keith
508 Rustic Circle
Wylie, TX 75098
Utility Relocations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Parkway, Coppell, Texas
Dear Mr. Keith:
This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a
4-lane road with a 16' median.
Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is
a follow-up to the preliminary set of plans sent out on November 19, 2001. The enclosed
set of 60% plans includes the following sheets:
· Cover Sheet
· Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Roadway Sections
· Water & Sewer Adjustments
· Drainage AreaMap
· Storm Drain Plan & Profile
The current construction let date is planned for October 1, 2002. Please coordinate any
utility relocations accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincerely,
TranSystems Corporation Consultants
Craig Bond, P.E.
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell
500 W. 7th Street, Suite 600, Postal Unit #20 - Fort Worth, TX 76102-4773 - Tel: (817) 339-8950 · Fax: (817) 336-2247
Mamh 7, 2002
Mr. Steve Gilbreath
City of Grapevine
200 S. Main Street
Grapevine, Texas 76051
Re:
Utility Locations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Parkway, Coppell, Texas
Dear Mr. Gilbreath:
This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a
4-lane road with a 16' median.
Enclosed you will find a 60% set of plans. This set has been sent to utility companies to
aid them in their utility relocation designs. This is a follow-up to the preliminary set of
plans sent out on November 19, 2001. The enclosed set of 60% plans includes the
following sheets:
· Cover Sheet
· Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Roadway Sections
· Water & Sewer Adjustments
· Drainage Area Map
· Storm Drain Plan & Profile
The current constraction let date is planned for October 1,2002
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincerely,
TranSystems Corporation Consultants
Craig Bond, P.E. ~
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell
500 W. 7th Street, Suite 600, Postal Unit #20 - Fort Worth, TX 76102-4773 · Ich (817) 339-8950 - Fax: (817) 336-2247
March 7, 2002
C 0 N S U L T A N T S
Mr. Patrick Nwakoby
Explorer Pipeline
6846 South Canton
Tulsa, Oklahoma 74136
Re:
Utility Locations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Parkway, Coppell, Texas
Dear Mr. Nwakoby:
This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a
4-lane road with a 16' median.
Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is
a follow-up to the preliminary set of plans sent to you on November 19, 2001. The
enclosed set of 60% plans includes the following sheets:
· Cover Sheet
,, Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Roadway Sections
Water & SewerAdjnstments
· Drainage Area Map
· Storm Drain Plan & Profile
The current construction let date is planned for October 1, 2002. Please coordinate any
utility relocations accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincerely,
TranSystems Corporation Consultants
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell
500 W. 7th Street, Suite 600, Postal Unit 1120 * Fort Worth, TX 76102-4773 o Tel: (817) 339-8950 o Fax: (817) 336-2247
March 8, 2002
C 0 N S U L T A N T $
Mr. Scott Whaley
Quest Network Construction
4927 N. Jersey Court
Tucson, AZ 85705
Re:
Utility Relocations
Bethel Road, Coppell, Texas
Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line)
To: Freeport Parkway, Coppell, Texas
Dear Mr. Whaley:
This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a
4-lane road with a 16' median.
Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is
a follow-up to the preliminary set of ptans sent out on November 19, 2001. The enclosed
set of 60% plans includes the following sheets:
· Cover Sheet
· Project Layout
· Right-Of-Way Acquisition Plan
· Plan & Profile Sheets
· Proposed Roadway Sections
· Water & Sewer Adjustments
· Drainage Area Map
· Storm Drain Plan & Profile
The current construction let date is planned for October 1, 2002. Please coordinate any
utility relocations accordingly.
Should you need further information, please contact the undersigned at 972-280-9300. Any
questions for the City should be directed to Ken Griffin - Public Works Director or Suzan
Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you.
Sincerely,
TranSystems Corporation Consultants
Craig Bond, P.E./
Project Engineer
Enclosure
Cc: Ken Griffin-City of Coppell
Suzan Taylor - City of Coppell