ST9905-CS020308LETTER OF TRANSMITTAL 3010 LBJ Freeway, Suite 990 (972) 280-9300 * Fax (972) 280-9715 · TO: FROM: Mr. Charles Martinez 972-907-2964 Brower Design Services 1208 West Executive Drive Richardson, TX 75081 Craig Bond DATE: March 8, 2002 NO. 20000890 RE: Bethel Road Project Utility Relocation WE ARE SENDING YOU VIA: [] Mail [] Delivery,/HE FOLLOWING ITEMS: COPIES I DESCRIPTION I Electronic Copy of 60%Set of Plans THESE ARE TRANSMI~rED AS CHECKED BELOW: [] For Your Use X As Requested [] For Reviewand Comment [] [] For Approval [] Approved as Submitted Returned for Corrections See Remarks [] Approved as Noted [] Rejected -REMARKS: Enclosed you will find a 60% set of electronic plans to aid you in your utility relocation design for MSN, AT&T and SW Bell. This is a follow-up to the preliminary set of plans sent out on November 19, 2001. The enclosed set of 60% plans includes the following sheets: · Cover Sheet, Project Layout, Pdght-Of-Way Acquisition Plan, Plan & Profile Sheets, Proposed Roadway Sections, Water & Sewer Adjustments, Drainage Area Map, Storm Drain Plan & Profile The current construction let date is planned for October 1,2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972- 304-3679. Thank-you. COPY TO: SIGNED: GA200\00890-Coppell\adm~Faxes and Transmittals\T-BrowerDesign,doc March 7, 2002 C 0 N 8 U L T A N T 8 Mr. Mark Wilson TXU Communications Telecom Services Company 115 W. 7th Street, Suite 308 Fort Worth, Texas 76102 Re: Utility Relocations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Parkway, Coppell, Texas Dear Mr. Wilson: This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a 4-lane road with a 16' median. Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is a folloxv-up to the preliminary set of plans sent to you on November 19, 2001. The enclosed set of 60% plans includes the follo~ving sheets: ,, Cover Sheet · Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Roadway Sections · Water & Sewer Adjustments · Drainage Area Map · Storm Drain Plan & Profile The current construction let date is planned for October 1, 2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincerely, TranSystems Corporation Consultants Craig Bond, P.E. Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell 500 W. 7th Street, Suite 600, Postal Unit #20 o Fort Worth, TX 76102-4773 * Tel: (817) 339-8950 · Fax: (817) 336-2247 March 7, 2002 C 0 N S U L T A N T S Mr. Reeves Partain TXU Electric & Gas 301 S. Harwood, 6 South Dallas, Texas 75201 Re: Utility Relocations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Parkway, Coppell, Texas Dear Mr. Partain: This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a 4-lane road with a 16' median. Enclosed you ~vill find a 60% set of plans to aid you in any utility relocation design. This is a follo~v-up to the preliminary set of plans sent to you on November 19, 200 I. The enclosed set of 60% plans includes the following sheets: · Cover Sheet · Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Road~vay Sections · Water & Sewer Adjustments · Drainage Area Map · Storm Drain Plan & Profile The current construction let date is planned for October 1, 2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincerely, TranSystems Corporation Consultants Craig Bond, P.E. Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell 500 W. 7th Street, Suite 600, Postal Unit #20 · Fort Worth, TX 76102-4773 · Tel: (817) 339 8950 · Fax: (817) 336-2247 March 7, 2002 C 0 N S U L T A N T S Mr. Bob Holland Verizon 540 W. Elm Lewisville, Texas 75067 Re: Utility Locations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Park~vay, Coppell, Texas Dear Mr. Holland: This letter is in reference to the proposed xvidening of Bethel Road from a 2~lane road to a 4-lane road with a 16' median. Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is a follow-up to the preliminary set of plans sent to you on November 19, 2001. The enclosed set of 60% plans includes the following sheets: · Cover Sheet ,, Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Roadway Sections · Water & Sewer Adjustments · Drainage Area Map · Storm Drain Plan & Profile The current construction let date is planned for October 1, 2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincemly, TranSystems Corporation Consultants Craig Bond, P.E. Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell. 500 W. 7th Street, Suite 600, Postal Unit #20 · Fort Worth, TX 76102-4773 * Tel: (817) 339-8950 o Fax: (817) 336-2247 March 6, 2002 C 0 N S U L T A N T 8 Ms. Glenda Fisher Touch America cio Po~ver Engineers, Inc. 3900 S. Wadsworth Blvd. Suite 700 Lakewood, Colorado 80235 Re: Utility Locations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Parkway, Coppell, Texas Dear Ms. Fisher: This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a 4-lane road with a 16' median. Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is a follow-up to the preliminary set of plans sent to you on November 19, 2001. The enclosed set of 60% plans includes the following sheets: · Cover Sheet · Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Roadway Sections · Water & Server Adjustments · Drainage Area Map · Storm Drain Plan & Profile The current construction let date is planned for October l, 2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincerely, TranSystems Corporation Consultants Craig Bond, P.E: Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell 500 W. 7th Street, Suite 600, Postal Unit #20 · Fort Worth, TX 76102-4773 o Tel: (817) 339-8950 · Fax: (817) 336-2247 March 7, 2002 TION /t,~ CONSULTANTS Touch America c/o Mr. T.C. Keith 508 Rustic Circle Wylie, TX 75098 Utility Relocations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Parkway, Coppell, Texas Dear Mr. Keith: This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a 4-lane road with a 16' median. Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is a follow-up to the preliminary set of plans sent out on November 19, 2001. The enclosed set of 60% plans includes the following sheets: · Cover Sheet · Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Roadway Sections · Water & Sewer Adjustments · Drainage AreaMap · Storm Drain Plan & Profile The current construction let date is planned for October 1, 2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincerely, TranSystems Corporation Consultants Craig Bond, P.E. Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell 500 W. 7th Street, Suite 600, Postal Unit #20 - Fort Worth, TX 76102-4773 - Tel: (817) 339-8950 · Fax: (817) 336-2247 Mamh 7, 2002 Mr. Steve Gilbreath City of Grapevine 200 S. Main Street Grapevine, Texas 76051 Re: Utility Locations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Parkway, Coppell, Texas Dear Mr. Gilbreath: This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a 4-lane road with a 16' median. Enclosed you will find a 60% set of plans. This set has been sent to utility companies to aid them in their utility relocation designs. This is a follow-up to the preliminary set of plans sent out on November 19, 2001. The enclosed set of 60% plans includes the following sheets: · Cover Sheet · Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Roadway Sections · Water & Sewer Adjustments · Drainage Area Map · Storm Drain Plan & Profile The current constraction let date is planned for October 1,2002 Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincerely, TranSystems Corporation Consultants Craig Bond, P.E. ~ Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell 500 W. 7th Street, Suite 600, Postal Unit #20 - Fort Worth, TX 76102-4773 · Ich (817) 339-8950 - Fax: (817) 336-2247 March 7, 2002 C 0 N S U L T A N T S Mr. Patrick Nwakoby Explorer Pipeline 6846 South Canton Tulsa, Oklahoma 74136 Re: Utility Locations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Parkway, Coppell, Texas Dear Mr. Nwakoby: This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a 4-lane road with a 16' median. Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is a follow-up to the preliminary set of plans sent to you on November 19, 2001. The enclosed set of 60% plans includes the following sheets: · Cover Sheet ,, Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Roadway Sections Water & SewerAdjnstments · Drainage Area Map · Storm Drain Plan & Profile The current construction let date is planned for October 1, 2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincerely, TranSystems Corporation Consultants Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell 500 W. 7th Street, Suite 600, Postal Unit 1120 * Fort Worth, TX 76102-4773 o Tel: (817) 339-8950 o Fax: (817) 336-2247 March 8, 2002 C 0 N S U L T A N T $ Mr. Scott Whaley Quest Network Construction 4927 N. Jersey Court Tucson, AZ 85705 Re: Utility Relocations Bethel Road, Coppell, Texas Limits: From West City Limits of Coppell, Texas (Dallas/Tarrant County Line) To: Freeport Parkway, Coppell, Texas Dear Mr. Whaley: This letter is in reference to the proposed widening of Bethel Road from a 2-lane road to a 4-lane road with a 16' median. Enclosed you will find a 60% set of plans to aid you in any utility relocation design. This is a follow-up to the preliminary set of ptans sent out on November 19, 2001. The enclosed set of 60% plans includes the following sheets: · Cover Sheet · Project Layout · Right-Of-Way Acquisition Plan · Plan & Profile Sheets · Proposed Roadway Sections · Water & Sewer Adjustments · Drainage Area Map · Storm Drain Plan & Profile The current construction let date is planned for October 1, 2002. Please coordinate any utility relocations accordingly. Should you need further information, please contact the undersigned at 972-280-9300. Any questions for the City should be directed to Ken Griffin - Public Works Director or Suzan Taylor - C.I.P. Coordinator at 972-304-3679. Thank-you. Sincerely, TranSystems Corporation Consultants Craig Bond, P.E./ Project Engineer Enclosure Cc: Ken Griffin-City of Coppell Suzan Taylor - City of Coppell 500 W. 7th Street, Suite 600, Postol Unit //20 - Fort Worth, TX 76102-4773 o Tel: (817) 339-8950 - Fax: (817) 336-2247