ST0001-CS020227 (2)February 27, 2002
Schrickel, Rollins and Associates, Inc.
116l Corporate Drive West, Ste 200
Arlington, Texas 76006
Attn.: Chris Schnitger, P.E.
RE: Change Order Number 2
Dear Mr. Schnitger,
I have reviewed the letter sent to you fi.om City of Coppell in regards to pricing and the
scope variations for change order number two. The pricing and scope change is
acceptable to ISt as indicated on that letter dated February 21, 2002.
Thank you for your help in regards to the above, and please do not hesitate to contact
Infrastructure Services, Inc. at (972) 240-8064 if further information should be required.
Sincerely,
Philip Bennett
File: Corr. To (14510007)
Cc: $,l?an Taylor (City of Coppell)