Loading...
ST0001-LR020306'4- 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppeli Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 144228 Project No.: 015729 Date of Service: 02/20/2002 Report Date: 03/06/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at thc placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordenee with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRAc'roR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Cattimore PLANT: 7 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 02/20/2002 WEATHER CONDITIONS: TIME SAMPLED: 9:15am BATCHTIME: 8:28aI~1 TEMPERATURE (F) = AIR 60 F CONCRETE: 72 F ~vc~ No: 947 TICgrT NO: 7113465 AIR CONTENT (%): 5.0 uNrr wEiG~rr (pc0: NA OVERALL PLACEMENT LOCATION: Paving - intersection of Freepo~ & Ruby SAMPLE LOCATION: 10' north x 12' west of southeast REPORT OF TESTS comer of Ruby Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOA~D STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (PaD TYPE 1 1 4.5 02/23/2002 3 112450 3980 Unbonded Cap 1 2 4.5 02/27/2002 7 121760 4310 Unbonded Cap 1 3 4.5 03/20/2002 28 Unbonded Cap 1 4 4.5 03/20/2002 28 Unbonded Cap 1 6 Hold 01DK Page 1 of 2 RoneEngineers Report No.: 144228 ~t~l~l Project No.: 015729 Client: City of Coppell Water added at site: 15 9allons Technician: Anthony Maldonado Report Distribution: (1) City of Coppcll (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. Started: 7:30am Finished: ll:00am (1) City of Coppell (1) Schrickcl, Rollins & Assoc., Inc. LIMITATIONS: The test results presented her~n w~re prepared b~sed upon the specific samples provided for testing. We assumc no responsibility for variation in quality (compositio~ appearance, performance, etc.) or any other feature of similar subject maR~r provided by persons or conditions over which we have no control. Our letters and repogts are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the writtea approval of Rone Engineers, Inc. 01DK Page 2 of 2 -RoneEngineers Client: City of Coppell Atta: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109  8908 Ambassador Row Dallas, Texas 75247-4510 ~'~ ~ (~O O { (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 144160 Project No.: 015729 Date of Service: 02/19/2002 Report Date: 03/06/2002 Project: Services: Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast eomprassive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 3" - $" 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 02/19/2002 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 2:20pm BATCHTIME: l:13pm TEMPERATURE (F) -AIR 61 F CONCRETE: 60 F TaUCK NO: 753 TIC~T nO: 6169303 AIRCONTENT(%): 3.5 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Freepor~ parkway paving SAMPLE LOCATION: Station 31+50 REPORT OF TESTS Conc~te Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force)' (psi) TYPE 1 1 4.0 02/22/2002 3 84525 2990 Unbonded Cap 1 2 4.0 02/26/2002 7 112710 3990 Unbonded Cap 1 3 4.0 03/05/2002 14 117240 4150 Unbonded Cap 1 4 4.0 03/19/2002 28 Unbonded Cap 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, ~tc.) or any other f~atux¢ of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive usc of the clients to whom they are addressed and shall not be ~produced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 2 RoneEngineers Report ~To.: 144160 m~m~m~;~l~ ProiectNo.: 015729 Client: CityofCoppell CYLINDER MEASURED MARKED SLUMP SET NO. (inches) DATE TESTED AGE (days) MAXIMUM LOAD Obs. force) COMPRESSIVE STRENGTH (psi) FRACTURE TYPE Water added at site: 5 gallons Technician: Todd Jonas Report Distribution: (1) City of Coppell (1) City of Copp¢ll (1) City of Coppell (1) Infrastructure Sereices, Inc, Started: 12:00pm (1) City of Coppoll Finished: 3:30pm (1) Sch~ickel, Rollins & Assoc., Inc. Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and ~porS are for the exclusive ~e of the clients ~ whom they are addressed and shall not be reproduced except in full without the wri~en approval of Rone Engineers, Inc. 01DK Page 2 of 2