Loading...
ST0001-LR0202288908 Ambassador Row Dallas, Texas 75247-4510 RoneEn gineers ; (214) 630-9S19 (fax) CONCRETE COMPRESSIVE STRENGTH TEST ! Client: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 144160 Project No.: 015729 Date of Service: 02/19/2002 Report Date: 02/28/2002 Project: Services: Creel<view Drive and Freeport Parkway Coppell, TX Obtain samples of fresh ennc~te at the placement locations, perform required field testing, east compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: co~rraAcrOm Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattiraore pLANT: 6 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN i.D.: 42 PLACEMENT DATE: 02/19/2002 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 2:20pm BATCHTIME: l:13pm TEMPERATURE OF) - AIR 61 F CONCRETE: 60 F · aUCKNO: 753 TICRETNO: 6169303 AIR CONTENT (%): 3.5 UNIT WEIGHT (Pc0: NA OVERALL PLACEMENT LOCATION: Freeport Parkway paving SAMPLE LOCATION: Station 31+50 REPORT OF TESTS Concrete Compressive Cylinder x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (Inche~) TESTED (days) Obs. force) (psi) TYPE 1 1 4.0 02/22/2002 3 84525 2990 Unbonded Cap 1 2 4.0 02/26/2002 7 112710 3990 Unbonded Cap 1 3 4.0 03/05/2002 14 Unbonded Cap 1 4 4.0 03/19/2002 28 Unbonded Cap 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. Wc assume no responsibility for variation in quality (composition, appearance, perfommnce, etc.) or any other feature of slmilar subject matter provided by persons or conditions over which we have no contwl. Our lc/teas and reports arc for the exclusive usc of thc clients to whom they arc addressed and shall not be reproduced except in full without the wriaen approval of Rone Engineers, Inc. 01DK Page 1 of 2 Report No.: 144160 Project No.: 015729 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) Client: City of Coppell DATE TESTED AGE (days) RoneEngineers MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE Obs. force) (psi) TYPE Water added at site: 5 gallons Technician: Todd Jonas Report Distribution: (1) City of Coppell (1) City of Coppcll (1) City of Coppell (1) Infrastructure Services, Inc. Started: 12:00pm (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Finished: 3:30pm Rone E~ ' Clay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other thamre of similar subject matter provided by persons or conditions over which we have no eonlrol. Our letters and reports are for the exclusive use of the clients ~ whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 2