Amberpoint BP-LR020306WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
Procedure:
03/06/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
Building Pad - see attached sketch General Contractor:
Injector:
94021029.0106
94O21029
Amberpoint Building No. 1
Ambe~point Bus. Pk. @ Coppell
Coppell, Texas
Hill & Wilkinson
Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 5th & 6th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Technician: K. Douglas
Report Distribution:
( 1 ) Transwestera Conunercial Services
(1) O'Brien & Associates, Inc.
( I ) TechniStructures, Inc.
( 1 ) City of Coppell - Constr. Insp.
(1) City of Coppell - Bldg. lnsp.
(I) Hill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Insurance
~ Engin~g,
Eugene Harbour
Principal
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wrdlen approval of HBC Engineer
@i
WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
Procedure:
03/06/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0105
94021029
Amberpoint Building No.1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Building Pad - see attached sketch General Contractor: Hill & Wilkinson
Injector: Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Commen~:
Technician: S. Campbell
Report Distribution:
(I) Transwcstcm Commercial Services
(1) O'Brien & Associates, Inc.
(1) T¢chniStmctures, Inc.
(I) City of Coppell - Constr. Insp.
(1) City ofCoppell - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
(1) HalffAssociates
(1) State Farm Insurance
Engineering, Inc.
Eugene Harbour
Principal
99SS This report is exclusively ~or the use of the client indicated above and shall not be reproduced in full w~hout written approval of HBC Engineer
~E~O~-F ~o. '. ~
T
__ /