Loading...
Amberpoint BP-LR020306WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 03/06/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: Building Pad - see attached sketch General Contractor: Injector: 94021029.0106 94O21029 Amberpoint Building No. 1 Ambe~point Bus. Pk. @ Coppell Coppell, Texas Hill & Wilkinson Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 5th & 6th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: K. Douglas Report Distribution: ( 1 ) Transwestera Conunercial Services (1) O'Brien & Associates, Inc. ( I ) TechniStructures, Inc. ( 1 ) City of Coppell - Constr. Insp. (1) City of Coppell - Bldg. lnsp. (I) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance ~ Engin~g, Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wrdlen approval of HBC Engineer @i WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 03/06/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0105 94021029 Amberpoint Building No.1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Building Pad - see attached sketch General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Commen~: Technician: S. Campbell Report Distribution: (I) Transwcstcm Commercial Services (1) O'Brien & Associates, Inc. (1) T¢chniStmctures, Inc. (I) City of Coppell - Constr. Insp. (1) City ofCoppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. (1) HalffAssociates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 99SS This report is exclusively ~or the use of the client indicated above and shall not be reproduced in full w~hout written approval of HBC Engineer ~E~O~-F ~o. '. ~ T __ /