Loading...
Amberpoint BP-LR020301 (3)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 03/01/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0084 94021029 Amberpoint Building No.1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Building Pad - see attached sketch General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X ~iection to refusal at each location. X Commen~: Technician: S. Campbell Report Distribution: (1) Transwcstem Commercial Services (1) O'Bricn & Associates, Inc. (I) TcchniStmclurcs, Inc. (1) City of Coppell - Constr. lnsp. (1) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. (l) H~lff Associates (1) State Farm Insurance H~ Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 03/01/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: Building Pad - see attached sketch General Contractor: Injector: 94021029.0083 94021029 Amberpoint Building No.l Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Hill & Wilkinson Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: K. Douglas Report Distribution: (1) Transwcstcm Commercial Services (1) O'Bricn & Associates, Inc. (1) TeclmiStmcturcs, Inc. (1) City of Coppell - Constr. Insp. (1) City o£Coppell -Bldg. Insp. (1) Hill & Wilkinson, Ltd. (1) HalffAssociates (I) State Farm Insurance I--Be Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be mpreduced in full without written approval of HBC Engineer 3 I :I I ® ® .© ® -@