Amberpoint BP-LR020227WATER INJECTION OBSERVATION ENGINEERING, 1NC. Date of Service: Client No.: Client: Location: Procedure: 02/27/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd. Suite 600 W · Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0079 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Building Pad General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X I[iection to refusal at each location. X Comments: Technician: K. Douglas Report Distribution: (l)Transwestern Commercial Services (1) O'Bfien & Associates, Inc. (1) TechniStmctures, Inc. (I) City of Coppell - Constr. lnsp. (1) City of Coppell - Bldg Insp. (1) Hill & Wilkinson, Ltd. ( I ) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 9911w This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wdtten approval of HBC Engineer WATER INJECTION OBSERVATION Date of Service: 02/27/02 Report No.: Client No.: 3181 Project No.: Client: Transwestern Commercial Services Project: 5001 Spring Valley Rd. Suite 600 W Dallas, TX 75244 94021029.0078 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Location: Building Pad General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of iniection was 5 feet maximum. X Injection to refusal at each location. X Comments: Technician: S. Campbell Report Distribution: ( I )Transwestera Commercial Services (1) O'Brien & Associates, Inc ( 1 ) TechniStructures, Inc. (I) City of Coppell - Constr. Insp. ( 1 ) City of Coppell - Bldg. Insp. (1) Hill & Wilkinson, Ltd ( I ) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 9911w This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer