Loading...
U-Haul-CS020228Baird, Hampton & Brown, Inc. Engineering & Surveying February 28, 2002 Mr. Gary Johnson, PE Assistant City Engineer The City of Coppell 255 Parkway, PO Box 478 Coppell, Tx 75019 Te1(972)304-3679, Fax (972)304-3673 RE: U-HAUL ADDITION, LOT 1, BLOCK 1 Mr. Johnson: We've received and have incorporated the City's review comments dated February 19th, '02; we believe the enclosed ! revised site/civil plans to be complete and ready for construction. In reference to comment 2.(g) which reads, "A large portion of the finished floor is proposed at 470.0 as opposed to 467.5 in the site plan approved by Council. The 470.0 elevation is 3 feet to 4.5 feet above the adjacent ground. Although this poses no Engineering issues, the Building Official and Planning Department may have issues with regard to the building and conformance with the approved site plan. Please comment.", we offer the following. U-Haul is aware of the building height limitations stipulated on the approved Site Plan. With regards to comment 5.(a) which reads, "Obtain a letter of acknowledgement from Jack-in-the-Box with respect to connecting of the existing fire waterline", we offer the following. The water lines have been stubbed across the common property line for this purpose, and are within U- Haul's property. The actual connections will be made without disturbing Jack-in-the-Box. We've contacted Jack-in-the-Box and have requested their acknowledgement. Tllenk you, BHB Engineering & Surveying Konstantine Bakintas, PE Vice President Enclosure: City Marked-Up Plans & Comments Letter 2 Sets of Revised/Corrected Final Plans E-mails (2) With Planning Department Regarding Comment 2.(g) E-mail to Jack-in-the-Box Regarding Comment 5.(a) CC: Andrea Roy - Planning Department Jeff Evans - U-Haul, & File E:\2001.000.000\017~2001.017.004\DOC\GARY JOHNSON.DOC 309 W. 7th Street, Suite 500 Fort Worth, Texas 76102 Tel: 817-338-1277 Fax: 817-338-9245 E-Mail: mail@bhbinc.c~Jm