Loading...
ST0001-CS020322From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> "Suzan Taylor (staylor@ci.coppell.tx.us)" <staylor@ci.coppell.tx.us> Fri, Mar 22, 2002 8:48 AM Creekview Suzan, I asked Philip about how he came up with the number for "Value of Extra Work Performed" at the bottom of the pay estimate no. 3. This is what he did to get that number: Change Order # 1 Change Order #2 Change Order #3 (fences and trees) Change Order #3 (brick pavers) -$18,050.00 +$ 1,459.13 +$14,950.00 -$ 3,201.10 Value of Extra Work Performed = -$4841.97 Does Larry have a problem with ISI charging for a partial change order? I think we can keep track of this but we probably should have had ISI had line items for whatever we added to the contract. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX From: To: Date: Subject: "Schnitger, Chris" <cschnitger@sradesign.com> "Suzan Tay or (staylor@c~.coppell.tx.us)" <staylor@ci.coppelLtx.us> 3/22/02 2:45PM Creekview Suzan, I faxed Philip a copy of the pay estimate items that are in question. I asked him to verify that the items truly are complete as the estimate claims. I also told him that he should be closer to 112 tons of lime and not 121. If he is using extra lime then he needs to get that approved by Larry. Chris Chris Schnitger, P.E. Schrickel, Rollins & Assoc. 1161 Corporate Dr. W.; Ste. 200 Arlington, Texas 76006 (817) 649-3216 (817 649-7645 FAX