Loading...
Amberpoint BP-LR020312 (2)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 03/11/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0118 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Location: Building Pad - see attached sketch General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 7th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iqjection to refusal at each location. X Commen~: Technician: S. Campbell Report Distribution: (l) Transwcstem Commercial Services (1) O'Brien & Associates, Inc. (1) T¢chniS~uclurcs, Inc. (1) City of Coppell - Cons~r. lnsp. (1) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd, (1) Halff Associates (1) Stat~ Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal 99ss 'l~is report is exclusively for the use of the client indicated above and shall not be rep~nduced In full without written approval of HBC Engineer (~-- l !