Amberpoint BP-LR020309WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
03/09/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0116
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Location:
Building Pad - see attached sketch General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 7th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
I~,iection to refusal at each location. X
Commen~:
Technician: K. Douglas
Report Distflbuflon:
(1) Transwestem Commercial Services
(I) O'Brien & Associates, Inc.
(1) T¢chniStructures, Inc.
(1) Cit7 of Copp¢ll - Constr. Insp.
(1) Ciiy of Copl~ll - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
(l) Halff Associates
(1) State Farm Insurance
I-DC Engineering, Inc.
Eugene Harbour
Principal
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer
I I I
_ _l__
WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
Procedure:
03/08/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0111
94021029
Amberpoint Building No.1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Building Pad - see attached sketch General Contractor: Hill & Wilkinson
~m ~it~ y~ai ~' Injector: Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
~iection to refusal at each location. X
Comments:
Technician:
Report Distribution:
(1) Transwestern Commercial Services
(1) O'Bricn & Associates, Inc.
(1) TechniStructures, Inc.
(I) Ciiy of Coppell ~ Constr. Insp.
S. Campbell
~ Engineering,~c.
(l) Ci[y of Coppell - Bldg. Insp. ~
(1) Hill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Insurance
Eugene Harbour
Principal
99ss l~is report is exclusively for the use of the client indicated above and shall not be reproduced in full without w~itten approval of HBC Engineer