Amberpoint BP-LR020308 (2)WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
03/08/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0113
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Location:
Building Pad - see attached sketch General Contractor: Hill & Wilkinson
Injector: Jowell
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Iq, jection to refusal at each location. X
Commen~:
Technician: K. Douglas
Report Distribution:
( I ) Transwestem Commercial Services
(1) O'Bricn & Associates, Inc.
( 1 ) TcchniStructurcs, Inc.
(1) City of Coppell - Constr. lnsp.
99ss
Engineering, Inc.
(1) City of Coppall - Bldg. lnsp. ~
(1) Hill & Wilkinson, Ltd.
( I ) Halff Associates
(1) State Farm Insurance
Eugene Harbour
Principal
This report is exclusively for the use o~' the cJient indicated above and shall ~ot be reproduced in full wlthotJt wdtten approval of HBC Engineer
??
WATER INJECTION OBSERVATION
ENGINEERII~, INC.
Date of Service:
Client No.:
Client:
Location:
Procedure:
03/07/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd. Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0110
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. @ Coppell
Coppell, Texas
Building Pad - see attached sketch General Contractor: Hill & Wilkinson
Injector: Jowell
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacin~ of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: K. Douglas
Report Distribution:
(l)Transwestem Commercial Services
( 1 ) O'Brien &Asscciates, Inc.
(I) TechniStructures, Inc.
( 1 ) City of Coppell - Constr. lnsp.
(I) City of Coppeli - Bldg. lnsp.
(1) Hill & Wilkinson, Ltd.
(I) Halff Associates
(I) State Farm Insurance
I-~ Engineering, Inc.
Eugene Harbour
Principal
9911w This report is exclusively for the use of the client indicated above and shall not be reproduced in full without writlen approval of HBC Engineer
?????