Amberpoint BP-LR020308 (2)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 03/08/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0113 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Location: Building Pad - see attached sketch General Contractor: Hill & Wilkinson Injector: Jowell Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Iq, jection to refusal at each location. X Commen~: Technician: K. Douglas Report Distribution: ( I ) Transwestem Commercial Services (1) O'Bricn & Associates, Inc. ( 1 ) TcchniStructurcs, Inc. (1) City of Coppell - Constr. lnsp. 99ss Engineering, Inc. (1) City of Coppall - Bldg. lnsp. ~ (1) Hill & Wilkinson, Ltd. ( I ) Halff Associates (1) State Farm Insurance Eugene Harbour Principal This report is exclusively for the use o~' the cJient indicated above and shall ~ot be reproduced in full wlthotJt wdtten approval of HBC Engineer ?? WATER INJECTION OBSERVATION ENGINEERII~, INC. Date of Service: Client No.: Client: Location: Procedure: 03/07/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd. Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0110 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Building Pad - see attached sketch General Contractor: Hill & Wilkinson Injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacin~ of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: K. Douglas Report Distribution: (l)Transwestem Commercial Services ( 1 ) O'Brien &Asscciates, Inc. (I) TechniStructures, Inc. ( 1 ) City of Coppell - Constr. lnsp. (I) City of Coppeli - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. (I) Halff Associates (I) State Farm Insurance I-~ Engineering, Inc. Eugene Harbour Principal 9911w This report is exclusively for the use of the client indicated above and shall not be reproduced in full without writlen approval of HBC Engineer ?????