Loading...
Amberpoint BP-LR020307 (2)WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 03/12/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0123 94021029 Amberpoint Building No.1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Building Pad - see attached sketch General Contractor: Hill & Wilkinson injector: Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 7th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Commen~: Technician: S. Campbell Report Distribution: (1) Tramwcstem Commercial Services (1) O'Bricn &Associatcs, Inc. (1) TcchniStmcturcs, Inc. (1) City of Coppell - Constr. Insp. (1) City of Copp¢ll - Bldg. Insp. (1) Hill & Wilkinson, Ltd. (1) HalffAs$ociates (1) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal 99ss This report is exclusively for the use of the client indicated above and shall not be mpreduced in full without wdttefl approval of HBC Engineer '~0 WATER INJECTION OBSERVATION ENGINEERING, 1NC. Date of Service: Client No.: Client: Location: Procedure: O3/07/O2 3181 Transwestem Commercial Services 5001 Spring Valley Rd. Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0109 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Building Pad - see attched sketch General Contractor: Injector: Hill & Wilkinson Jowell On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 6th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: On this date, four injection rigs were working this area. Surfactant was supposed to be added two (2) times a day. Jowell was also instructed by Brian, Hill & Wilkinson's superintendent, to let one of HBC's technician witness the addition. The surfactant was never added on this date. Technician: S. Campbell Report Distribution: ( l )Transwestern Commercial Services (1) O'Brien & Associates, Inc. ( 1 ) TechniStructures. [nc. (1) City of Coppell - Constr. [nsp. (I) City of Coppell - Bldg. Insp. (I) Hill & Wilkinson, Ltd. ( 1 ) Halff Associates (1) State Farm Insurance ~ Engineering, Inc. Eugene arb~our Principal 9911w This report is exclusively for the use of the client indicated above and shall not be reproduced in tull without wrglen approval of HBC Engineer I