Loading...
ST0001-LR020321 (3)RoneEn gine ers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 144228 Project No.: 015729 Date of Service: 02/20/2002 Report Date: 03/21/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 02/20/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 9:15am BATCHTIME: 8:28am TEMPERATURE (F) - AIR 60 F CONCRETE: 72 F TRUC~C NO: 947 TICm~T NO: 7113465 AIR CONTENT (%): 5.0 UNIT WEIGHT (,pcf}: NA OVERALL PLACEMENT LOCATION: Paving - intersection of Freeport & Ruby SAMPLE LOCATION: REPORT OF Tg,~qT~q 10' north x 12' west of southeast comer of Ruby Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs, force) (psi) TYPE 1 I 4.5 02/23/2002 3 112450 3980 Unbonded Cap 1 2 4.5 02/27/2002 7 121760 4310 Unbonded Cap 1 3 4.5 03/20/2002 28 142225 5030 Unbonded Cap 1 4 4.5 03/20/2002 28 133600 4720 Unbonded Cap Average 4880 1 6 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fitil without the written approval of RoDe Engineers, Inc. 01DK Page 1 of 2 Report No.: 144228 RoneEngineers Project No.: 015729 Client: City of Coppell Water added at site: 15 ~allons Technician: Anthony Maldonado Report Distribution: (1) City of Coppell (1) City of Copp¢ll (1) City of Copp¢ll (1) Infrastructure Service~, Inc. Started: 7:30am Finished: 11:00am (1) City of Coppcll (1) Schriekel, Rollins & Assoc., Inc. Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for varlafion in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 2 .oneEnug 8908 Ambassador Row Dallas, Texas 75247=45?.0 (214) 630-9745 (2?.4) 63O-98?.9 (fax) REPORT OF PULVERIZATION/GRADATION TESTING Client: City of Coppell ACm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 146067 Project No.: 015729 Date of Service: 03/15/2002 Report Date: 03/21/2002 Project: Services: Creekx4ew Drive and Freeport Parkway Coppell, TX Pulverization/Gradation Testing Report of Test On this date, a Rone Engineers, Inc. representative was on site to perform Pulverization/Gradation Testing. The results are attached. Technician Time: Page 1 of 2 Technician: Joe Semigan Report Distribution: (1) City of Copp¢ll (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. 2:00pm - 3:30pm (1) City of Coppell ( 1 ) Schrickel, Rollim & Assoc., Inc. Project Manager LIMITATIONS: The test results p~sented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feaiure of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the cheats to whom they are addressed and shall not be reproduced except in fidl without the wrlttea approval of Rone Engineers, Inc. 99DK Page I of 1 %Tooo I R°neEr g ?l 8908 Ambassador ROW Dal~, Texas 75247 214.630.9745 FAX 214.630.9819 REPORT OF GRADATIONS OF LIME TREATED SOILS Client: Project: City of Coppell Creekview Ddve and Freeport Parkway Coppell, TX Report No.: 146067 Project No.: 015729 Date of Service: 03/15/2002 Page 2 of 2 Specifications: 100% passing 1 3/4 sieve 60% passing fl-4 sieve Weight Pement Weight Pement Sample Retained Passing Retained Passing Location Weight 1 3/4" sieve 1 3/4" sieve ~ sieve #4 sieve 1 Southbound lane, Freeport, Station 31+25 10.0 0 100% 3.8 62.0% 2 Southbound lane, Freeport, Station 33+25 10.0 0 100% 4.0 60.0% 3 Southbound lane, Freeport, Station 35+25 10.0 0 100% 3.4 64.0% 4 5 6 7 8 9 10 Additional Comments: LIMITATIONS: T~e test results presented herein were prepared based upon the speck samples provided for testing. We assume no respenslblllt7 for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by pecsons or conditions over which we have no control. Our letters and reports am for the excJusi~ use of the clients to whom they are addressed.