Loading...
ST0001-LR020312 (2)RoneEn gineers 8908 Ambassador Row Dallns, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 143433 Project No.: 015729 Date of Service: 02/11/2002 Report Date: 03/12/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMPO~: AIR(%): TEST METHOD: coro'~croR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATZ: 02/11/2002 WEATHER CONDITIONS: Cleat TIME SAMPLED: 10:45am BATCHTIME: 10:06am TEMPERATURE (F) - AIR 46 r CONCRETE: 5 1 F TRUC~: NO: 819 TICKZT NO: 3140259 AIR CONTENT (%): 4.2 U~aT WEIGHT (pcf): NA OVERALL pLACEMENT LOCATION: Paving - northbound left turn lane 90'-190' SAMPLE LOCATION: REPORT OF TESTS 20'-30' west of east curb and 130' north of start of left turn lane Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. 0nehes) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.0 02/18/2002 7 111890 3960 Unbonded Cap 1 2 3.0 02/18/2002 7 114960 4070 Unbonded Cap Average 4020 1 3 3.0 03/11/2002 28 138630 4900 Unbonded Cap 1 4 3.0 03/11/2002 28 135355 4790 Unboaded Cap Average 4850 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conUml. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wri~en approval of Rone Engineers, Inc. 01DK Page 1 of 2 Report No.: 143433 Project No.: 015729 Client: City of Coppell CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED AGE (day~ RoneEngineers MAXIMUM LOAD (lbs. force) COMPRESSIVE STRENGTH (psi) FRACTURE TYPE Water added at site: 10 gallons Technician: Dan G~mmon Report Distribution: (1) City of Coppell (1) City of Coppell (1) City of Coppell (1) Infmstxucture Services, Inc. Started: 9:00am Finished: h00pm Rou?f/ (l) City of Copp¢ll /~'_/ (l) Schrickel, Rollins & Assoc., Inc. Stark Proj~ :ct Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature o f similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 2