PA9702-LR 991014 (2)MORTAR COMPRESS/7'-TE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, T~!s 75247
Date of Service: 09/15/1999 Report No.: 9925021 Report Date
10/14/1999
Client No.: COPPELL Project No.: 94991118
Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr
Attn: Bra~FReid 300 Block of Parkway Blvd
732 DeForest
Coppell TX 75019 Coppell, Texas/Prj. #96051
Services: Obtain samples of mortar from mortar board, identify location of masonry installation for the sample, cast
compressire strength samples (2" x 2" x 2" cubes).
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. MORTAR CLASS: N/A
MORTAR SUPPLIER: On-Site PLACEMENT DATE: 09/15/1999 RATCHTWm: N/A
PLANT: On-Site TnVIE SAMPLna: N/A ElY: Del Ratlift
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Warrll, clear, calm
STRENGTH: 1500pSi @ 28 Days TEMPERATURE (F) - AIR 73 V MORTAR: 75 F
TRUCK NO: N/A TICKET SO: N/A
TEST METHOD: ASTMC109 PLACEMENTLOCATION: Gymnasiumnorthwallofbuildingarea
ASTM C270
SAMPLE LOCATION: Connector wall 15th course
SAMPLE SIZE: 2" X 2" X 2"
REPORT OF TESTS
CUBE MAXIMUM COMERESSIVE
MARKED DATE AGE LOAD STRENGTH
SET NO. TESTED (days) (lbs. force) (psi)
1 1 09/22/1999 7 9460 2370
1 2 10/13/1999 28 9610 2400
1 3 10/13/1999 28 9750 2440
Average 2420
Technician Time: See Report #9925023
Technician: Del Ratlift Started: Finished: ~ ~
Report Distribution:
(0 City of Coppell (1) City of Coppell - Engineering
(1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. Insp. Eugene Harbour
(l) Turner Engineers (1) City of Coppell - Leisure Serv Dept Vice President
( 1 ) Hisaw & Associates
This report is cxclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
08LLW Page 1 of 1