Loading...
PA9702-LR 991014 (2)MORTAR COMPRESS/7'-TE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, T~!s 75247 Date of Service: 09/15/1999 Report No.: 9925021 Report Date 10/14/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~FReid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of mortar from mortar board, identify location of masonry installation for the sample, cast compressire strength samples (2" x 2" x 2" cubes). PROJECT DATA CONTRACTOR: Hisaw & Assoc. MORTAR CLASS: N/A MORTAR SUPPLIER: On-Site PLACEMENT DATE: 09/15/1999 RATCHTWm: N/A PLANT: On-Site TnVIE SAMPLna: N/A ElY: Del Ratlift SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Warrll, clear, calm STRENGTH: 1500pSi @ 28 Days TEMPERATURE (F) - AIR 73 V MORTAR: 75 F TRUCK NO: N/A TICKET SO: N/A TEST METHOD: ASTMC109 PLACEMENTLOCATION: Gymnasiumnorthwallofbuildingarea ASTM C270 SAMPLE LOCATION: Connector wall 15th course SAMPLE SIZE: 2" X 2" X 2" REPORT OF TESTS CUBE MAXIMUM COMERESSIVE MARKED DATE AGE LOAD STRENGTH SET NO. TESTED (days) (lbs. force) (psi) 1 1 09/22/1999 7 9460 2370 1 2 10/13/1999 28 9610 2400 1 3 10/13/1999 28 9750 2440 Average 2420 Technician Time: See Report #9925023 Technician: Del Ratlift Started: Finished: ~ ~ Report Distribution: (0 City of Coppell (1) City of Coppell - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. Insp. Eugene Harbour (l) Turner Engineers (1) City of Coppell - Leisure Serv Dept Vice President ( 1 ) Hisaw & Associates This report is cxclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 08LLW Page 1 of 1