Loading...
ST0004-CN010823 T H E C I T Y 0 F cOPiSELL August 24, 2001 R.J. Evans, Jr., Vice President Quantum Contracting, Inc. P.O. Box 430 Rockwall, TX 75087 RE: Freeport Parkway Reconstruction Project ST 00-04 Dear Mr. Evans: Attached is Change Order #1 for the referenced project. Please sign and returned one original to me. If you have any questions feel free to call Larry Davis, the Construction Inspector on this project, at (972) 304-3685. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works cc: Larry Davis, Conslmction Inspector st00-04~changeord Iltr CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNER: CHANGE ORDER NO.: Freeport Parkway Reconstruction Project # STO0-04 Quantum Contracting, Inc. City of Coppell 1 DATE: 8/23/01 Item Description Quantity Unit Unit Price Total Reconstruct and shorten median nose at Gateway Crossover Sawcut, demolish existing median nose and brick pavers. Install new curb and gutter subgrade treatment. Concrete paver base and brick pavers. Shorten median nose by +/- lO feet. Sawcut, demolish and excavate dirt fi-om existing median. Install new curb and gutter and 6" thick reinforced median cap including subgrade treatment. Shorten median by +/- l0 feet. Total Revision to Contract Amount Previous contract amount Net increase in contract amount Revised contract amount Net increase in contract time of completion Revised Contract time of completion I LS 1 LS 1,400.00 $1,400.00 1,800.00 $1,800.00 $3,200.00 $ 778,000.00 $ 3,200.00 $ 781,200.00 0 Calendar Days 150 Calendar Days Reco~ Engineer Date' Agre~ b"~ ContraS'or Date The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. J, ~~ Acc~by Owner ~ Date QUANTUM CONTRACTING, 1NC. P. O. BOX 430 ROCKWALL, TEXAS 75087 972-771-9511 (FAX) 1-972-722-1114 VIA FAX August 17, 2001 Lar~y Davis, Inspector City of Coppell Engineering Dept. P O Box 478 Coppell, TX 75019 RE: Freeport Parkway PROPOSAL Reconstruct and shorten median nose at Gateway Crossover to accommodate truck turning. 1. Sawcut, demolish existing median nose and brick pavers. Install new curb and gutter subgrade treatment. Concrete paver base and brick pavers. Shorten median nose by +/- 10 feet. Lump Sum $1,400.00 2. Sawcut, demolish and excavate dirt from existing median. Install new curb and gutter and 6" thick reinforced median cap including subgrade treatment. Shorten median by +/- 10 feet. Sincerely, Vice President Lump Sum $1,800.00