Loading...
FS8901-CS 910215,,NDM NATHAN D. MAIER CONSULTING ENGINEERS, INC. February 15, 1991 Mr. Ronald W. Morrison Kimley-Horn and Associates, Inc. 12660 Coit Road, Suite 200 Dallas, Texas 75251 Re: HRWS 4.5 Acre Tract Floodplain Reclamation Coppell, Texas NDM No.: 88-2-017 Dear Mr. Morrison: Enclosed is a copy of the letter from the City of Coppell to FEMA transmitting the flood reclamation study for the subject tract. The letter indicates the reclamation study complies with the City of Coppell's requirements. The owner and developer, Andy Rogers, paid the fees to the City of Coppell for your review. Also enclosed is a copy of the letter from FEMA returning their initial fee and indicating that the request will be treated as a revision to the floodway. Subsequently, on the behalf of the City of Coppell, you submitted a revised study for the Elm Fo~k in the City of CoppelL You advised me that the area of the HRWS tract in the shadow of the railroad embankment track was ineffective for flow purposes and was removed from the floodway. It has been over two (2) years since the Initial work began on this project. The owner and developer is anxious to know when he can do something with the property. This seems to be an unreasonable amount of time to be delayed. If the project met the requirements of the City of Coppell for the old study and was incorporated in the new study, it seems reasonable that the owner and developer should be able to move forward. If you have any further questions on the above or if we need to discL~__~ this further, please call. Sincerely, NATHAN D. MNER CONSULTING ENGINEERS, INC. EAM/rdp Enclosures (2) cc: '~Shohre Daneshmand, P.E. C~y of Coppell Andy Rogers Three NorthPark/8800 N. Central Expw¥./Suite 300/Dallne, Texan 7S231/(214) 739-4741