Loading...
FS8901-CS 900703The City With A Beautiful Future July 3, 1990 Mr. Frank Pagano Federal Emergency Management Agencyf/ Region VI, Federal Center 800 Nort~lS~8 Den~.~ TX 76201-3% RE: HRWS 4.5 Ac. TrAc~ Floodplain %~< Request~~ional LOMR Reclamation Study Dear Mr. Pagano: P.O. Box 478 Coppell, Texas 75019 214-462 -0022 Attached, please find one copy of floodplain reclamation study report regarding the above referenced project prepared by Nathan D. Maier Consulting Engineers, Inc. dated August 1989. This document has been reviewed by the City of Coppell's Hydrologist, Mr. Ron Morrison, of Kimley-Horn & Assoc., Inc., as noted in his attached letter dated June 7, 1990. Based on Mr. Morrison's review, the subject reclamation study complies with the City of Coppell's floodplain ordinance No. 87390 requirements. We, therefore, request that you consider issuing a conditional Letter of Map Revision (LOMR) for this project, as requested by the applicant. If you have any technical questions, please call Mr. Err A. Meyer, P.E. at (214) 739-4741, and for any administrative assistance, please call me at (214) 462-8495. Sincerely, · ~ Acting City Engineer MSD/BD xc: Steve Goram, Director of Public Works Err A. Meyer, P.E., Nathan D. Maier Consulting Engineers, Inc. HRWS3.MSD