Loading...
ST0001-LR020329RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Project~ Services'~ce Density T=st in accordance with ASTM Standards. Report No.: 146559 Project No.: 015729 Date of Service: 03/27/2002 Report Date: 03/29/2002 CONTRACTOR: InfrasU-ucture Services, Inc. Test Methods: ASTM D-2922 ASTM D-3017 M/DNo. D~cHpflon PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 32685 Test Mode: DT MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Moisture Current: 661 Previous: 679 Standard Counts Density Current: 3135 Previous: 3092 Project Requirements Moisture Density 1 Dark Brown, Gray and Tan Clay 25.5 94.5 Optimum +5 95 min FIELD DENSITY TESTS TEST NO TEST LOCATION Utility Backfill Retest, storm drain crossover, Station 3+75, creekview, 3' below grade Utility Backfffi PROBE DEPTH M/n MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (at}co (per} (% max) 2 Storm drain crossover, Station 3+75, creekview, 2' below grade Utility Backfill 3 Storm drain crossover, Station 3+75, creekview, 1' below grade Utility Backf'ffi 4 Storm drain crossover, Station 3+75, creekview, final grade 6" 1 27.5 120.6 94.6 I I00 I 6" 1 30.3 118.6 91.0 ! 196 6" 1 26.9 122.6 96.6 / 102 ~ ! 6" 1 26.6 121.4 95.9 I 101[ Test results on this report meet project specification. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, [nc. 07DF Page 1 of 2 Technician: Joe Jernigan Report Distribution: (1) City of Coppcll ( 1 ) City of Coppell ( 1 ) City of Coppell (1) Infrastructure Services, Inc. Started: 10:30A Finished: 12:30P (1) city of Coppell (1) $chrickel, Rollins & Assoc., Inc. Ron E'Iat Stark Proje~ Manager