Loading...
Amberpoint BP-LR020316REPORT OF SOIL-LIME MIXTURE PULVERIZATION Date of Service: Client No.: Client: 03/16/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: ENG--, INC. 8901 C~peater Fn~y., Suite 100 ~ Tex~ 75247 94021029.0129 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Contractor: Test Location: Building Pad, grid lines 1.5 to Q and 7.2to 11 Test Method: NTCOG Specification Requirements: Minimum Passing 1 3/4" Sieve: 100% Minimum Passing ~4 Sieve: 60% Sample Condition: Field Moist TEST 1-314" SIEVE ~4 SIEVE NO. LOCATION % PASSING % PASSING 1 Grid line P/10.5 100 71 2 Grid line O/10.5 100 64 3 Grid line M.5/10.5 100 66 4 Grid line L/10.5 100 67 5 Grid line J.5/10.5 100 63 6 Grid line J/9 100 68 7 Grid line K.5/9 100 72 8 Grid line M/9 100 71 9 Grid line N.5/9 100 64 10 Grid line P/9 100 61 11 Grid line 0.5/7.5 100 66 12 Grid line N/7.5 100 64 13 Grid line L.5/7.5 100 63 14 Grid line K/7.5 100 66 Technician: B. Rengstorff Report Distribution: (1) Transwcstem Commercial Services (I) O'Brien & Associates, Inc. (1) T¢chniStmcturcs, Inc. (I) City of Copp¢ll - Constr. Insp. 309 Engineering, Inc. (1) City ofCoppell - Bldg. Insp. y (1) Hill & Wilkinson, Ltd. (1) State Fa.,m Insurance (I) HalffAssociates Eugene Harbour Principal This reporl is exclusively for thc use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, lnc,