Amberpoint BP-LR020316REPORT OF SOIL-LIME MIXTURE PULVERIZATION
Date of Service:
Client No.:
Client:
03/16/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd., Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
ENG--, INC.
8901 C~peater Fn~y., Suite 100
~ Tex~ 75247
94021029.0129
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Contractor:
Test Location:
Building Pad, grid lines 1.5 to Q and
7.2to 11
Test Method: NTCOG
Specification Requirements:
Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing ~4 Sieve: 60%
Sample Condition: Field Moist
TEST 1-314" SIEVE ~4 SIEVE
NO. LOCATION % PASSING % PASSING
1 Grid line P/10.5 100 71
2 Grid line O/10.5 100 64
3 Grid line M.5/10.5 100 66
4 Grid line L/10.5 100 67
5 Grid line J.5/10.5 100 63
6 Grid line J/9 100 68
7 Grid line K.5/9 100 72
8 Grid line M/9 100 71
9 Grid line N.5/9 100 64
10 Grid line P/9 100 61
11 Grid line 0.5/7.5 100 66
12 Grid line N/7.5 100 64
13 Grid line L.5/7.5 100 63
14 Grid line K/7.5 100 66
Technician: B. Rengstorff
Report Distribution:
(1) Transwcstem Commercial Services
(I) O'Brien & Associates, Inc.
(1) T¢chniStmcturcs, Inc.
(I) City of Copp¢ll - Constr. Insp.
309
Engineering, Inc.
(1) City ofCoppell - Bldg. Insp. y
(1) Hill & Wilkinson, Ltd.
(1) State Fa.,m Insurance
(I) HalffAssociates Eugene Harbour
Principal
This reporl is exclusively for thc use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, lnc,