Loading...
Amberpoint BP-LR020317REPORT OF SOIL-LIME MIXTURE PULVERIZATION Date of Service: Client No.: Client: 03/17/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0140 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Contractor: Test Location: Building Pad, grid lines A to 1.5 and 7.2to 11 Test Method: NTCOG Specification Requirements: Minimum Passing 1 3/4" Sieve: 100% Minimum Passing g4 Sieve: 60% Sample Condition: Field Moist TEST 1-314" SIEVE fl4 SIEVE NO. LOCATION % PASSING % PASSING 1 Grid line H.5/10.5 100 68 2 Grid line G/10.5 100 63 3 Grid line E.5/10.5 100 72 4 Grid line D/10.5 100 73 5 Grid line B.5/10.5 100 74 6 Grid line B/9 100 75 7 Grid line C.5/9 100 73 8 Grid line E.5/9 100 77 9 Grid line F.5/9 100 64 10 Grid line H/9 100 66 11 Grid line H.5/7.7 100 63 12 Grid line G/7.7 100 67 13 Grid line E.5/7.7 100 64 14 Grid line D/7.7 100 70 15 Grid line B.5/7.7 100 73 Technician: B. Rengstorff Report Distribution: (I) Transwcstcrn Commercial Services (I) O'Bricn & Associates, Inc. (1) TcchniStmclarcs, Inc. (1) City ofCoppell - Constr. lnsp. 309 (I) City of Coppell - Bldg. lnsp. (I) Hill & Wilkinson, Ltd. (i) HalffAssociates (I) Slate Farm Insurance I'~ Engineering, Inc. Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.