Amberpoint BP-LR020317REPORT OF SOIL-LIME MIXTURE PULVERIZATION
Date of Service:
Client No.:
Client:
03/17/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0140
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Contractor:
Test Location:
Building Pad, grid lines A to 1.5 and
7.2to 11
Test Method: NTCOG
Specification Requirements:
Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing g4 Sieve: 60%
Sample Condition: Field Moist
TEST 1-314" SIEVE fl4 SIEVE
NO. LOCATION % PASSING % PASSING
1 Grid line H.5/10.5 100 68
2 Grid line G/10.5 100 63
3 Grid line E.5/10.5 100 72
4 Grid line D/10.5 100 73
5 Grid line B.5/10.5 100 74
6 Grid line B/9 100 75
7 Grid line C.5/9 100 73
8 Grid line E.5/9 100 77
9 Grid line F.5/9 100 64
10 Grid line H/9 100 66
11 Grid line H.5/7.7 100 63
12 Grid line G/7.7 100 67
13 Grid line E.5/7.7 100 64
14 Grid line D/7.7 100 70
15 Grid line B.5/7.7 100 73
Technician: B. Rengstorff
Report Distribution:
(I) Transwcstcrn Commercial Services
(I) O'Bricn & Associates, Inc.
(1) TcchniStmclarcs, Inc.
(1) City ofCoppell - Constr. lnsp.
309
(I) City of Coppell - Bldg. lnsp.
(I) Hill & Wilkinson, Ltd.
(i) HalffAssociates
(I) Slate Farm Insurance
I'~ Engineering, Inc.
Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.