Loading...
WA9701-AG020409 REQUEST FORM COFFELL AGENDA ~ ~' ~ ~ '~,~ ~*~~CITY COUNCIL MEETING: April 9, 2002 ITEM # 8/D ITEM CAPTION: Consider approval of entering into a contract with Birkhoff, Hendricks & Conway Consulting Engineers for the design of a 16" water line on Belt Line/Denton Tap from Bethel Road to Airline Drive in an amount not to exceed $57,240; and authorizing the City Manager to sign. APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M - Tunnell S - York Vote - 7-0 SUBMITTED BY: Kenneth M. Griffin, P.E. TITLE: Director of Engineering/Public Works STAFF COMMENTS: This water line was identified in the Water Distribution System Master Plan as an undersized water line. Currently, there is a 16" water line north of Bethel Road up to S.H. 121 and there is a 12" water line south of Airline Drive to Lakeshore Drive. This water line currently exists as an 8" water line. Upgrading this water line to a 16" water line will complete all deficiencies along Belt Line Road/Denton Tap Road from Lakeshore to S.H. 121. Staff recommends approval of the contract with Birkhoff, Hendricks & Conway in an amount not to exceed $57,240. Staff will be available to answer any questions at the Council meeting. BUDGET AMT. $ FINANCIAL COMMENTS: project. AMT. EST. $ +k-BID $ Funds have been allocated in the 1991 Water/Sewer CIP account for this DIR. INITIALS: ~ . -=' ~Grlffin g.? Agenda Request Form - Revised 5/00 FIN. REVIEW: CITY MANAGER REVIEW: Document Name: #engl-lAR.doc JOlflq W. BIKICHOFF, P E. RONALD V COIqWAY, PE CO2kY C HENDRICKS, PE. BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 Dallas, Texas 75231 Fax (214) 361-0204 March 25, 2002 Phone(214) 361-7900 Mr. Kenneth M. Grif£m, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Attention: Ms. Suzan C. Taylor, C.I.P. Coordinator Re: Denton Tap/Beltline Road Water Line (WA 97-01) Revised Engineering Services Agreement Dear Mr. Griffin: We are pleased to submit this revised proposal for furnishing engineering services required for the preparation of plans, specifications, bidding documents and construction administration of the Denton Tap/Beltline Road Water Line Project. The project consists of approximately 4,000 linear feet of 16-inch waterline along Denton Tap/Beltline Road, fi.om Airline Drive to Bethel Road. The enclosed project location map more specifically defines the project limits. We recommend the City budget a construction amount in the range of $440,000 for this project and are enclosing our itemized opinion of construction cost for your review. We have made a preliminary investigation of a proposed ~vater line route. Although it appears the water line can be placed within the fights-of-way of Denton Tap/Beltline Road, we are including a nominal amount for boundary surveys, deed research, and preparation of plats and field note descriptions in our special sen-ices phase of the agreement in the event these service are required. Our engineering services for this project shall include the following: BASIC SERVICES A. Design Phase Preparing construction plans, specifications and bidding documents for construction of the Denton Tap/Beltline Road Water Line project. The design phase of this project shall include: · Construction Plan- Profile Sheets prepared at a scale of not less than 1"= 40' · Standard Details · Special Details · Cover Sheet, Location Map and Sheet Index Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell Denton Tap/Beltline Road Water Line Engineering Fee Proposal March 25, 2002 Page Number 4 · Submittals to State Regulatory Agencies, as required · Preparation of required Highway, Railroad and Utility Permits, as required · Coordination with other Utility Companies · Design Review Meetings · Opinion of Probable Construction Estimate · Preparation of Specifications and Contract Documents · Assist in procuring Geotechnical Engineering information or reports as the project requirements dictate · After review and approval of conceptual plan, print preliminary plans and specifications for review by the City and the Utility Companies. Bidding Phase · Assist in Advertising for Bids · Opening, Tabulation and Evaluating Bids received · Reviewing the qualification of the low bidder(s) and preparing recommendations for award of a Construction Contract Construction Administration · Assist in development of Quality Control and Materials Testing contract · Consult with Owner as to actions based on Engineering matters · Assist in execution of Contract Documents by preparing five (5) sets of conformed contract specifications Assist in and attend a Pre-Construction Conference as Required · Make periodic visits to the job-site · Preparing and issuing routine Field Changes with the Owners approval · Preparing and issuing routine Change Orders with the Owners approval · Review of Shop Drawings, Test Reports and other data · Preparation of Monthly and Final Pay Requests · Conduct a Final Inspection w/th the Owner · Preparation and delivery of one set of record drawings on mylar sepias to the City Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell Denton Tap/Beltline Road Water Line Engineering Fee Proposal March 25, 2002 Page Number 4 II. SPECIAL SERVICES Design Surveys · Construction Surveys · Property Surveys, if required · Deed Research, if required · Preparation of Easement Documents, if required · Printing of final plans and specifications for dism'oution to prospective bidders and the successful contractor. Plans are to be distributed from the offices of Birkhoff, Hendricks & Conway, L.L.P. Geotechnical Evaluation above-described services, we propose to be compensated on the following basis: For the BASIC SERVICES Compensation for basic services shall be on a lump sum basis of $38,500 in accordance with the schedule below: $30,800 A. Design Phase .................................................................................................... B. Bidding Phase ...................................................................................................... $ !,925 C. Construction Phase ............................................................................................. $5,775 II. SPECIAL SERVICES Compensation for Special Services shall be based on our actual salary cost times 2.35, with expenses invoiced at actual cost times 1.15. We suggest you budget an amount not to exceed $18,740 in the following amounts for the Special Services: A. Design Surveys ................................................................................................... $7,680 B. Construction Surveys .......................................................................................... $1,800 C. Boundary Surveys (if required) ................................................................................ $960 D. Preparation of Easement Documents (if required) ................................................. $4,000 E. Printing of Final Plans and Specifications ........................................................... $1,800 F. Geotechnical Evaluation ..................................................................................... $2,500 Mr. Kenneth M. Griffirg P.E. Director of Engineering & Public Works City of Coppell Denton Tap/Beltline Road Water Line Engineering Fee Proposal March 25, 2002 Page Number 4 If you are in agreement with this proposal, please have one copy executed on behalf of the City of Coppell and returned to our office, or if you prefer we will be pleased to assist in the preparation of the standard engineering agreement on the City's contract form. We stand ready to begin work hmnediately on this project upon your authorization to proceed and look forward to our continued working relationship with you, your staff and the City of Coppell. We are available at your convenience to discuss this proposal further. · :; ......... ~ ..... ,._: ' PROPOSED WATER LINE BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS Project No. Client: Project: CITY OF COPPELL, TEXAS Denton Tap Road Water Line 16-inch Water Line from Airline Drive to Bethel Road Date: 3/7/02 By: G.C.H. ENGINEER'S OPINION OF CONSTRUCTION COST ltemNo. I Description I Quantity I Unit I Price I Amount I Furnishing and Installing 16-Inch PVC Waterline with Embedment 3,600 L.F. $ 42.00 $ 151,200.00 Furnish & Install 16" PVC Waterline in 24" Dia., 3/8" Thick 2 Encasement Pipe by Other than Open Cut 400 L.F. $ 275.00 $ 110,000.00 3 Furnishing and Installing 16-Inch Butterfly Valve 5 Ea. $ 3,800.00 $ 19,000.00 4 Furnishing and Installing 24-inch Butterfly Valve 2 $ 4,800.00 5 Connecting to Existing 12-Inch Waterline 1 Ea. $ 2,500.00 $ 2,500.00 6 Connection to Exsiting 24-inch Water Line 1 Ea. $ 8,500.00 $ 8,500.00 7 Connection to Existing 16-inch Water Line I Ea. $ 5,000.00 $ 5,000.00 8 Furnishing and Installing Ductile Iron Fittings 10,000 Lbs. $ 1.75 $ 17,500.00 9 Removing and Replacing Existing Asphalt Pavement 80 S.Y. $ 45.00 $ 3,600.00 10 Removing and Replacing Existing Concrete Pavement 213 S.Y. $ 65.00 $ 13,866.67 11 Extra Concrete Encasement 40 C.Y. $ 120.00 $ 4,800.00 12 Extra Crushed Stone Embedment 60 C.Y. $ 60.00 $ 3,600.00 13 Furnish, Install and Maintain Solid Block Sod 4,000 S.Y. $ 6.50 $ 26,000.00 14 Fumish, Install and Maintain Hydromulch seed and Fertilizer 4,000 S.Y. $ 2.50 $ 10,000.00 Furnishing, Installing, Maintaining and Removal of Erosion Control 15 Devices I L.S. $ 7,000.00 $ 7,000.00 16 iFurnishin$, Installin~ and Maintaining Traffic Control Dev/ces 1 L.S. $ 9,000.00 $ 9,000.00 17 iDesin~ingTrench Safely System 1 L.S. $ 4,500.00 $ 4,500.00 18 Desil~ing and Installing Trench Safety Systems 3,600 L.F. $ 2.00 $ 7,200.00 Subtotal: $ 403,266.67 Continl~encies and Miscellaneous Items 10% $ 40,326.67 1 Total: $ 443,593.33 USE: $ 443,600.00.. j~Coppetl~St67~s~ca~ch~jaS_~t/ma~ Page 1 of/