Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PA9702-LR 991012 (2)
CONCRETE COMPR IVE STRENGTH TES'''N 8901 Carpenter Frwy., Suite gl00 Dallas, Texas 75247 Date of Service: 09/10/1999 Report No.: 9924604 ReportDate 10/12/1999 Client No,: COPPELL Project No,: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: BradReid 300BlockofParkwayBlvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 09/10/1999 BATCH TIME: 7:09am PLANT: Lewisville T~M~ S~MPLED: 7:40am uv: Lanney Ratcliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEM~'E~TUm~ (F) - Am 76 P CONCRETe: 84 F SLUMP: 5.0" I~IAX TRUCK NO: 218 T~CKgT NO: 77536 Am: 4-7% Amco~rgNT(~): 5.5 VNITW~XORT(p~: N/A TEST METHOD: ASTM C- 143 pt~,CEMENT LOCATION: Paving ASTM C-172 ASTM C-39 SAMPLE LOCATION: Entry Paving S of Rotunda REPORT OF TESTS ACC n T VE VAnOS: 30 CYLINDER MEASURED MAXIM~L~M COMERF, SSIVE MARKED SLU~MP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 4.00 09/17/1999 7 99510 3520 1 2 4.00 10/08/1999 28 154910 5480 1 3 4.00 10/08/1999 28 148700 5260 Average 5370 1 4 4.00 11/05/1999 56 Technicj. an T~.me: See Report~ #9924603 Technician: N/A Started: Finished: ~ Enginee~nc, Report Distribution: (1) City of Copl~ll (1) City ofCoppell - Engineering (1) BrinkIcy Sargent Architects (1) City of Coppell - Bldg. Insp. Eugene Harbour (1) Tumer Engineers (1) City ofCoppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full witbout the written approval of HBC Engineering, Inc. 01TM Page 1 of I