Loading...
Amberpoint BP-LR020411CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0180 Service Date: April 3, 2002 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 ENGINEERING 8901 Carpenter Frwy., Suite#100 Dallas, Texas 75247 (214) 630-1010 Report Date: April 11,2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 9:00am Supplier: Potter Truck No: 114 Mix I.D. No.: 9337 Plant: 16 Ticket No: 612511 Sample Information Sample Time: 9:20am Date Cast: April 3, 2002 Technician: Steve Campbell Weather Conditions: Clear, windy Accumulative Yards: 10 Placement Method: Direct Discharge Sample Locations: Pier D-6 Placement Location: Piers D-6, E-6, F-6 Field Test Data Test Result Specification Test Method Slump, inches: 6.50 6-7 ASTM C-143 Air Content, %: None Concrete Temperature,° F: 62 ASTM C1064 Ambient Temperature, o F: 49 ASTM C-1064 Plastic Unit Weight, pcf: Laboratorv Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 1 6.00 28.27 04/10/2002 7 133,200 4,710 1 2 6.00 28.27 04/10/2002 7 133,560 4,720 Average 4,720 1 3 05/01/2002 28 1 4 05/01/2002 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Steve Campbell Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates Reviewed by: HBC Engin~ Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of 1 REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0179 Service Date: April 3, 2002 8901 Carpenter Frw¥., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 11,2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Steve Campbell // Report Distribution: HBC Engi~ (1) Transwestern Commercial Services (1) City of Coppell - Bldg Insp (1) O'Brien & Associates Inc (1) Hill & Wilkinson Ltd Reviewed by: (1) TechniStructures Inc (1) Halff Associates Eugene Ha,~our (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~ ~ <<~ REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0184 Service Date: April 4, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 11,2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Steve Campbell Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates Reviewed by: Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 uJ E E E E E E 0 0 0 0 E E ~ 0 z@ .ID _12 ~1 'o7 .<2_ > UJ