Loading...
Amberpoint BP-LR020409REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0174 Service Date: April 2, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 09, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Steve Campbell Report Distribution: (1) Transwestem Commercial Services (1) O'Brien & Associates thC (1) TechniStructures Inc (1) City of Coppell- Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates Reviewed by: HB,~ering Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 0 0 REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0172 Service Date: April 2, 2002 ENGINEEIL~NG 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 09, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation, See the attached sheet for recorded data. Technician: Gerry Graham Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates Reviewed by: ? HBC E ng i~/~ Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~s~s,.~F~. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0173 Service Date: April 2, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: April 09, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 8:25am Plant: 16 Supplier: Potter Concrete Truck No: 113 Mix I.D. No.: 9337 Ticket No: 612491 Sample Information Sample Time: 8:42am Date Cast: April 2, 2002 Technician: Gerry Graham Weather Conditions: Fair, cloudy Accumulative Yards: 10 Placement Method: Direct Discharge Sample Locations: D/7-G/7 = 4 Placement Location: Pier Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Result 6.50 67 64 Set Specimen Diameter Area No. ID (inches) (sq. inches) I 1 6.00 28.27 1 2 6.00 28.27 1 3 1 4 Specification Test Method 5-7 ASTM C-143 N/A ASTM C1064 ASTM C-1064 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 04/09/2002 7 126,140 4,460 04/09/2002 7 122,060 4,320 Average 4,390 04/30/2002 28 04/30/2002 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Gerry Graham Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates Reviewed by: (1) City of Coppell ~ Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of 1