Loading...
Amberpoint BP-LR020403REPORT OF REINFORCING STEEL OBSERVATION ENGINEERING, INC. Date of Service: 04/03/02 Client No.: 3181 Client: Transwestem Commercial Services 5001 Spring Valley Rd., Suite 600 W Dallas, TX 75244 Report No.: 94021029.0178 Project No.: 94021029 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Services: Drawings Utilized: Locations/Items Observed: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Working Drawing 06/S3.1 and l 1/S3. l Pier Caps B/6 to K/6 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings A~proved X Bar Length and Shape X Column Tie Spacing & Type ' Bar Size X Proper Bar Placement X Stirrup Spacing & Type X Bar Grade X Propedy Tied X Rebar C~ean X Dowel Barn in Place X Welded Splices Form Clean X Proper Bar Supports X Mechanical Splices Number of Bars X Proper Cover X Lapped Splices Discrepancies/Comments: The following discrepancy was noted at the time of this observation. 1. Tops of piers needed to be cleaned prior to concrete work. Field Results Report To: Technician: G. Graham Renort Distribution: ( 1 ) Transwcstem Commercial Services ( 1 ) O'Brien & Assoc., Inc. ( l ) TechniSiTuctums, Inc. (1) City of Coppell Constr. lnsp 309sks (l) City of Coppell - Bldg. Insp. m~ Eng., Inc. (1) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm insurance Eugene Harbour Principal This repor~ is exclusively for the use of the client indicated above and shall not be reproduced without wrdlen approval of HBC Engineering, Inc.