Loading...
Amberpoint BP-LR020329REPORT OF REINFORCING STEEL OBSERVATION ENGINEERING, [NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/29/02 Client No.: 3181 Client: Transwestern Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: 94021029.0169 Project No.: 94021029 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Services: Drawings Utilized: Locations/Items Observed: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Working Drawing, S3.1/06 Pier Cap at !d7 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ! ITEMS ORSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type X Bar Grade X Propedy Tied X Rebar Clean X Dowel Bars in Ptace X Welded Splices Form Clean X Proper Bar Supports X Mechanical Splices Number of Bars X Proper Cover X Lapped Splices Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: G. Graham Reoort Distribution: (I) Transwestem Commercial Services (1) O'Brien & Associates, Inc. (1) TechniStructures, Inc. ( 1 ) City of Coppell - Constr. lnsp. 309[Iw (1) City of Coppell - Bldg. b~sp. ~ Eng~C. (I) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Associates Eugene Harbour Principal This roper[ is exclusively ~or the use et the client indicaled above and shall not be reproduced without written approval et HBO Engineering, Inc.