Amberpoint BP-LR020328 (3)REPORT OF REINFORCING STEEL OBSERVATION
ENGINEERING, 1NC.
Date of Service: 03/28/02
Client No.: 3181
Client: Transwestern Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.: 94021029.0166
Project No.: 94021029
Project: Amberpoint Building No. 1
Amberpoint Bus. Pk @ Coppell
Coppell, Texas
Services:
Drawings Utilized:
Locations/items Observed:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Working Drawings, S3.1/06
Pier Caps at I/8, I/9 and 1/10
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type X
Bar Grade X Propedy Tied X
Rebar Clean X Dowel Ba~ ir1 Place X Welded Splices
Form Clean X Proper Bar Supports Mechanical Splices
Number et Bars X Proper Cover X Lapped Splices
Discrepancies/Comments: The following discrepancies were noted corrected at the time of this observation.
1. The pier tops needed to be cleaned.
2. The pier cap cages needed to be readjusted for proper clearance.
Field Results Report To:
Technician: G. Graham
Reoort Distribution:
( I ) Transwestern Commercial Services
( 1 ) O'Brien & Associates, Inc.
( I ) TechniStructums, Inc.
(1) City of Coppell - Constr. lnsp~
309sks
g~ Engineering, Inc.
(1) City of Coppell - Bldg. lnsp. ~
(1) Hill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Associates Eugene Harbour
Principal
This repori is exclusively for the use of the client indicated above and shall not be reproduced without written approval of HBC Engineering, Inc.