Loading...
ST0001-CS020331· ENVIRONMENTAL DRILLING · G£OTECHNICAL DRILLING 'Enclosed with this letter and monthly invoice is a copy of the Budget Report for the noted project. This report represents a detailed summary of the services perfo,~xed on the project by Rone Engineers. The project totals represent the original estimated budget, amount invoiced to date, and the remaining balance available for our services. i If there was no budget established for your project, then the project is considered to be !a time and material project and the invoiced amount is the total that has been billed to l the project as of this date. Please call (214) 630-9745 if you have any questions regarding this matter. DALLAS 8908 AMBASSADOR ROW DALL&$, TEXAS 75Z47 TELEPHONE 214-630-9745 FACSIMILE 214-630-9819 !Clay Stark CMT Project Manager Project No.: 015729 Creekvieve Drive and Freeport Park-way Coppell, TX BillCode Description Units Budget Report Budget Amount City of Coppell Invoiced Remaining umts Amount Umts Amount 1001 1001S 1003 1500 1601 2001 2005 2005R 2007 2010 2020 7001 7002 Concrete Technician (hourly) Concrete Technician Standby (II Concrete Test Cylinders (each) Asphalt Ex~raction & Gradation Asphalt Technician (hourly) Soils Technician (hourly) In-Place Density Test (each) In-Place Density Test (Retesti Pulverizations (each) Moisture Density Relationship Atterberg Limits (each) Transportation Charge (trip) Engineering & Report Review Project totals: 400.00 11,000.00 29.50 811.25 370.50 10,188.75 0.00 0.00 2.00 55.00 -2.00 -55.00 670.00 8,710.00 36.00 468.00 634.00 8,242.00 2.00 290.00 0.00 0.00 2.00 · 290.00 4.00 110.00 0.00 0.00 4.00 110.00 104.00 2,860.00 60.75 1,670.63 43.25 1,189.37 148.00 1,924.00 75.00 975.00 73.00 949.00 0.00 0.00 1.00 13.00 -1.00 -13.00 12.00 156.00 6.00 78.00 6.00 78.00 9.00 1,170.00 3.00 390.00 6.00 780.00 9.00 360.00 3.00 120.00 6.00 240.00 94.00 1,222.00 37.00 481.00 57.00 741.00 34.10 1,875.50 12.30 676.50 21.80 1,199.00 29,677.50 5,738.38 23,939.12 Apr 11,02 9:25am Page 77