Loading...
Northpoint Dr-LR020404REPORT OF LIME DETERMINATION ~NGINEERfNG Date of Service: Client No.: Client: 04/04/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd Suite 600W Dallas, Texas 75244 Report No.: 94021061.0026 Project No.: 94021061 Project: Utilities Coppell, Texas Services: Soil Description: Sample Location: Preparation: Results: Sample in situ soil from designated area and determine the reduction of Plasticity Index based on percentage of lime added. Dk reddish brown silty sandy clay Sta. 22+10, Northpoint Drive Wet LIME ADDED NONE 43 20 8.2 4% 42 5 12.2 19.8 6% 41 5 12.3 29.7 8% 40 5 12.3 39.6 10% 42 3 12.3 49.5 *Based on a 6-inch depth and a maximum soil unit weight of 110 pounds per cubic foot. The quantity of lime shown is intended to treat only 6 inches of soil. Should additional depth be treated during the mixing operation, additional lime will be required to compensate for the extra depth. Based on the test results, 5 percent lime (24.8 lbs./s.y.) should be adequate for this project. Technician: B. Rengstorff Report Distribution: (1) Transwestern Commerrcial Services (1) Glenn Thurman, Inc. (1) Halff Associates (1) City of Coppell - Engineering (1) City of Coppell - Bldg. Insp. (1) State Farm Insurance (1) Moss Construction Og,,r' land, P.E. Senior Project Manager Tills report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering. REPORT OF LIME DETERMINATION Date of Service: Client No.: Client: 04/04/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021061.0019 94021061 Northpoint Drive & Associated Utilities Coppell, Texas tzX(ilNEt!RING Services: Soil Description: Sample Location: Preparation: Results:' Sample in situ soil from designated area and determine the reduction of Plasticity Index based on percentage of lime added. RESULTS OF LABORATORY TEST Med brown clay Sta. 3+00, Northpoint Drive Wet LIME LIQUID PLASTICITY LIME REQUIRED* ADDED LIMIT INDEX pH (Ibs./s.y.) NONE 54 26 8.7 - 4% 54 11 12.2 18.0 6% 52 8 12.3 27.0 8% 52 8 12.3 36.0 10% 50 6 12.3 45.0 *Based on a 6-inch depth and a maximum soil unit weight of 100 pounds per cubic foot. The quantity of lime shown is intended to treat only 6 inches of soil. Should additional depth be treated during the mixing operation, additional lime will be required to compensate for the extra depth. Based on the test results, 6 percent lime should be adequate for this project. Technician: B. Rengstorff Report Distribution: (1) Transwestern Commerrcial Services (1) Glenn Thurman, Inc. (1) Halff Associates (1) City of Coppell - Engineering (1) City of Coppell - Bldg. Insp. (1) State Farm Insurance (1) Moss Construction ~]Cj~~ring ~ ,~-~eveland, P.E. Senior Project Manager Tiffs report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering REPORT OF LIME DETERMINATION Date of Service: Client No.: Client: 04/04/02 ' 3181 Transwestern Commercial Services 5001 Spring Valley Rd Suite 600W Dallas, Texas 75244 Report No.: Project No.: Project: 94021061.0025 94021061 Northpoint Drive & Associated Utilities Coppell, Texas IBC I NGIN EERI NG 8901 Carpenter F~vy,, Suite 100 D~. Tex~ 75247 Services: Soil Description: Sample Location: Preparation: Results: Sample in situ soil from designated area and determine the reduction of Plasticity Index based on percentage of lime added. RESULTS OF LABORATORY TEST Lt reddish borwn silty clay w/sand Sta. 10+80, Northpoint Drive Wet LIME LIQUID PLASTICITY LIME REQUIRED* ADDED LIMIT INDEX pH (Ibs./s.y.) NONE 49 22 8.9 4% 46 8 12.1 18.0 6% 48 5 12.3 27.0 8% 45 5 12.3 36.0 10% 49 4 12.3 45.0 *Based on a 6-inch depth and a maximum soil unit weight of 100 pounds per cubic foot. The quantity of lime shown is intended to treat only 6 inches of soil. Should additional depth be treated during the mixing operation, additional lime will be required to compensate for the extra depth. Based on the test results, 6 percent lime should be adequate for this project. Technician: B. Rengstorff Report Distribution: (1) Transwestem Commerrcial Services (1) Glenn Thurman, Inc. (1) Halff Associates (1) City of Coppell - Engineering (1) State Farm Insurance (1) Moss Construction Senior Project Manager This report is exclusively for the use of the ctient indicaled above and shall not be reproduced in full without written approval of HBC Engineering.